API 650 vertical welded storage tanks siphon-type drains
The company has been engaged in the design, construction and installation of foreign API 650 standard API 650 vertical welded storage tanks storage tanks for a long time. It has the international qualification of ASME welding technology, has the design ability of API 650 oil tanks and API 650 storage tanks, and has pressure vessel design and manufacturing license and GC pressure pipeline installation license. Certificate, API 650 vertical welded storage tanks petrochemical equipment pipeline general contracting qualification, safety production license, international trade import and export license.
When the API 650 vertical welded storage tanks is welded, the weldment should be fixed rigidly. After welding, when the weldment is cooled to normal temperature, the rigid fixation can be removed, which can effectively prevent angular deformation and wave deformation. Although some measures have been taken, the welding deformation of API 650 vertical welded storage tanks is still unavoidable, so it is necessary to take corrective measures to compensate the deformation. Mechanical correction is to make the parts easy to deform in the welding process by mechanical or other rigid materials to produce simple deformation, so as to restore the state before welding.
The API 650 vertical welded storage tanks stiffener ring and backing strip (if used) are primary components, and they shall comply with the requirements of API 620 storage steel tank Q.2.1. The stiffener rings may be fabricated from plate using an intermittent weld on alternating sides between the web and the flange.Except for aluminum or stainless steel tanks, all fillet welds shall consist of a minimum of two passes. The ends of the fillet welds shall be 2 in. from the rat hole (see Figure Q-1), and these welds shall be deposited by starting 2 in. from the rat hole and welding away from the rat hole. An acceptable alternative to the detail that includes stopping fillet welds 2 in. short of the rat hole would be to weld continuously through the rat hole from one side of the stiffener to the opposite side. All craters in fillet welds shall be repaired by back welding.
The company has a group of experienced steel plate continuous processing line construction, production management, operation and professional and technical personnel. The company is a modern enterprise integrating scientific research and development, production processing, sales and service. Our main products include hot rolled plates, seamless pipes, API 650 vertical welded storage tanks and steel structures. At the same time, it also adheres to international standards and adheres to the international line.
We have efficient and quick logistic team service. We promise that after the customer places the order, the spot products will be shipped, processed, and cut on the same day. The steel API 650 vertical welded storage tanks products will be shipped in 2-5 days according to the characteristics of the product. The company has always been adhering to the service concept of "integrity, pragmatism, enthusiasm" and dedicated to providing our customers with high-quality steel products and after-sales service.