API 650 storage tank for non-refrigerated service
API 650 internal floating roof oil tank executive standard: domestic design standard: GB50341-2003 "Vertical cylindrical steel welded oil tank design code"; domestic construction standard: GB50128-2005 "vertical cylindrical steel welded oil tank" Construction and Acceptance Specification; API 650 storage tank Foreign design standard: API650-2007 "Standard for Welded Steel Petroleum Storage Tanks."
Soil Structure Interaction: Soil structure interaction per API 650, Section E.6.1.6 may be used for OLE design providing the damping ratio does not exceed 10 %.Allowable StressesDesign allowable stresses shall be per API 620 large welded steel storage tank, Section Q.3.3, including the 33 % increase permitted for earthquake loads.Self-anchored Inner TankThe anchorage ratio for a self-anchored inner tank, J, shall not exceed 1.0 for the OLE design combination to limit uplift and stresses in the annular plate and corner weld.Foundation StabilityThe overturning ratio defined in API 650, Section E.6.2.3, Equation (E.6.2.3-1) shall be equal to or greater than 3.0 for the defined OLE event.
There is no dome roof in the top of the vertical external floating roof oil storage tank, only the disc floating roof which can float up and down. The wall plates are connected by butt welding, and the construction is usually carried out by the forward installation method, and the storage capacity is usually more than 10000 cubic meters. Vertical internal floating roof API 650 storage tank has both dome roof and internal floating roof. The internal floating roof floats on the liquid surface inside the dome roof oil tank and can float up and down. The storage capacity is usually between 1000 and 10000 cubic meters.
Company tenet: first class quality and service to create corporate brand.Business philosophy: people-oriented, innovation, continuous improvement, the pursuit of excellence. Quality policy: carry forward the quality spirit, build a perfect quality management system, and put the quality strategy into every detail of the company's daily work.Environmental policy: waste reduction and pollution prevention, continuous improvement, and environmental protection.
Tianjin warehouse mainly stores steel plates and steel pipes. The monthly replenishment is about 12000 tons. Our inventory cycle is short and flexible. Shanghai warehouse mainly stores API 650 storage tank ,steel plate and section steel. The average monthly purchase volume is about 15000 tons. The geographical location of the warehouse has greatly improved our performance in terms of transportation and delivery time.
The company formulates clear service process and service standard. To do a good job in after-sales service, first of all, clear service process and service standards should be formulated to let employees know which procedures to perform and which service standards to abide by.