API 650 flexible liquid storage tanks external pressure

Welding inspection of bottom plate of API 650 flexible liquid storage tanks, vertical oil tank: During the fabrication and installation of API 650 flexible liquid storage tanks, the bottom edge plate is welded first. According to the requirements of the technical standard, penetrant inspection is required for the weld of edge plate at the bottom of API 650 flexible liquid storage tanks, that is, penetrant testing is required for each weld bead priming, filling and capping. In the process of testing, if any defect is found, it shall be repaired immediately. After the repair, the surface coloring penetrant test shall be conducted again until the test result is qualified.

Structural shapes of 9% and 5% nickel steel may be furnished to the chemical and physical requirements of ASTM A353, A553, or A645. Physical tests shall be in accordance with the requirements of ASTM A6.
API 650 flexible liquid storage tanks used Piping, Tubing, and Forgings
Material used for piping, tubing, and forgings shall be compatible in welding strength, and thermal expansion coefficient with the tank shell material. In addition to the specific requirements of this appendix, all piping within the limitations of 1.3.2 shall fulfill the minimum requirements of ASME B31.3.

API 650 storage tank, double-layer oil tank environmental protection advantages: ordinary single-layer steel API 650 flexible liquid storage tanks oil tank is corroded by underground water and gas and electrolytic corrosion because it is buried underground all year round. The API 650 tank has a double-layer structure with a gap of 0.1 mm. The API 650 flexible liquid storage tanks outer layer of FRP ensures that the leakage will not directly leak into the soil and water source.

Enterprise style: unity, pragmatism, responsibility, and endeavorOperation Policy: realistic management, innovative technology, high quality, fast efficiency, low cost and complete service. Enterprise spirit: every year, every day, we should make progressEnterprise development is a process of continuous pursuit of progress. This spirit is reflected in the whole three-dimensional space of every person, every event and every time point in our enterprise. We should always continue to explore, break through and improve.

We have replenish steel materials stocks, now there are huge stocks of S355JR, A36, API 650 flexible liquid storage tanks A572 Gr 50, 16Mo3, A516 Gr 70, ABS grade A, AH32, AH36, EH36, SPA-H, SG295,SM700C etc steel materials. We can arrange delivery for those stock steel products within short time. Meanwhile, we also provide further processing for the API 650 flexible liquid storage tanks steel materials, such as cutting, drilling, bending, welding, etc. Please do not hesitate to contact us if you have any steel demands.

Have a question? Get a Free Consultation

If you are interested in our storage tanks, you can get contact with us through online consulting, demand table submission, e-mails and telephones.

Corporate Office

High-Tech Development Zone, Zhengzhou, China

Contact us

+86-371-86151527
[email protected]

Send a Message!