The thickness of the API standard 650 flexible liquid storage tanks wall plate, t, required by 5.10.3 for the latitudinal unit forces, T2, acting at this level is 0.57 in. The nozzle neck is seamless steel pipe and conforms to ASTM A53, Grade A; the materials in the tank wall and reinforcing pad conform to ASTM A442 Grade 55. The main joints in the tank walls are fully radiographed, double-welded butt joints. The adequacy of the reinforcement and attachment welds shown in Figure F-7 shall be determined.
To determine the length of the nozzle neck within the limits of reinforcement, the smaller of the following calculated values shall be used:(2.5)(0.625) = 1.56 in.
(2.5)(0.375) + 0.75 = 1.69 in.

The working pressure of the low-pressure storage tank is greater than that of the atmospheric storage tank, but its pressure is less than 0.1MPa. API 650 petroleum storage tanks are classified according to their environment: Above-ground storage tank: refers to the bottom of the storage tank at the design elevation of API standard 650 flexible liquid storage tanks and above; the bottom of the tank is below the design elevation of +0.00 but not exceeding.

In April 8th, 2018, our Philiphine customer purchased 1008 Tons API 5L Gr.B ERW pipes &Q345B seamless steel pipe for offshore oildfield resources drilling project. This is a regular demand almost every two month, and we has been cooperated more than three times, totally around 2100 tons API 5L Gr.B steel pipeline since 2015 year. We can supply the relative certificated for the API 5L Gr.B ERW pipes products like SGS report, B/L &Form M, and mill test certificate.

}

Treatment of API standard 650 flexible liquid storage tanks welding defects:
1. Lack of fusion: once found, it should be shoveled and grinded off before re welding.
2. Incomplete penetration: over standard defects shall be removed and re welded. When welding on both sides, the shallow side of the groove can be grinded and shoveled to expose the welding root on one side, and then the welding is repaired.
3. Slag inclusion: over standard defects shall be removed and re welded.
4. Crater: weld to full after grinding.
5. Air hole: if the internal air hole exceeds the standard, it shall be welded again after being removed by grinding shovel, and the surface air hole shall be removed by grinding wheel and then repaired.

If customers have any difficult problems during use of the steel materials, they can contact the company's after-sales service department to feedback the existing problems. The after-sales department will reply as soon as possible to ensure that each customer has a good after-sales experience. Under special circumstances, the after-sales service department will start the problem-solving process, and the engineers in charge of the area will quickly follow up to solve the problem.

Have a question? Get a Free Consultation

If you are interested in our storage tanks, you can get contact with us through online consulting, demand table submission, e-mails and telephones.

Corporate Office

High-Tech Development Zone, Zhengzhou, China

Contact us

+86-371-86151527
[email protected]

Send a Message!