5083 aluminum forgings API standard 650 self-anchored tank

The technology center has always been focusing on application research, improving market realization and scientific and technological contribution rate; taking user demand as the goal, highlighting the personalized development of products; taking the joint development of industry, University and research, and technology integration as the means, improving the starting point and level of innovation, and realizing the breakthrough of core technology; taking advanced research as the guide, pursuing the leap of technological development; taking system and mechanism innovation as the driving force, Promote and realize the working concept of technological innovation.

Requirements for prefabrication of the top of large vertical API standard 650 self-anchored tank: The prefabrication of the tank top shall be prefabricated in blocks according to the drawings. Pay attention to the spacing of the welds after installation when setting out the material. Reinforcing ribs should be formed and inspected with an arc-shaped template. When a single top plate needs to be spliced, butt joints should be used. The forming of a single top plate should be welded between the reinforcing ribs and the top plate on the mould. After forming, check with an arc-shaped sample plate, and the gap should not be greater than 10 mm.

Bearing on Foundations
Foundations shall preferably be designed to resist the load exerted by the API Standard 620 tank and its contents when the tank is filled with water to the design liquid level. Foundations shall be designed at least for the maximum operating conditions including the wind load. During the API standard 650 self-anchored tank water test, the total load on the foundation shall not exceed 125% of the allowable loading. If necessary, the water level during the test may be reduced below the design liquid level line so as not to exceed the 25% maximum overload (see Q.8.1.2).

Have a question? Get a Free Consultation

If you are interested in our storage tanks, you can get contact with us through online consulting, demand table submission, e-mails and telephones.

Corporate Office

High-Tech Development Zone, Zhengzhou, China

Contact us

+86-371-86151527
[email protected]

Send a Message!