Steel plate for shells of API Std 650 petroleum storage tanks
While GB50341 generally takes the weld coefficient as 0.9;When the minimum yield strength of API Std 650 petroleum storage tanks steel plate is greater than 390 MPa, take 0.85. The thickness of API 650 tanks is generally smaller than that of GB50341, and this difference is particularly evident in the design of large tanks, where the overall weight of the tanks varies greatly.
API Std 650 petroleum storage tanks foam generator is a fire extinguishing device fixed on the oil tank. One end of the foam generator is connected to the foam pipeline, and one end is flanged on the top layer of the API Std 650 petroleum storage tanks wall. Fire extinguishing foam flows through the air intake entrance of the fire foam chamber, inhaling a large amount of air to form foam, and breaking through the insulating glass into the tank (glass thickness is not greater than 2mm), so as to achieve the purpose of fire fighting.
The API Std 650 petroleum storage tanks stiffener ring and backing strip (if used) are primary components, and they shall comply with the requirements of API 620 storage steel tank Q.2.1. The stiffener rings may be fabricated from plate using an intermittent weld on alternating sides between the web and the flange.Except for aluminum or stainless steel tanks, all fillet welds shall consist of a minimum of two passes. The ends of the fillet welds shall be 2 in. from the rat hole (see Figure Q-1), and these welds shall be deposited by starting 2 in. from the rat hole and welding away from the rat hole. An acceptable alternative to the detail that includes stopping fillet welds 2 in. short of the rat hole would be to weld continuously through the rat hole from one side of the stiffener to the opposite side. All craters in fillet welds shall be repaired by back welding.
We can process the steel materials according to your drawing. Or if you can not make drawing, please send us API Std 650 petroleum storage tanks specific data and requirements, our technical department can make design and drawing for you, and then confirm with your technician or engineer. If all is OK, our processing center will process the steel materials according to the drawing. So no matter what size and shapes you need, we can meet demands at the most time.
Booking space and making power of attorney (ten copies of order); the data of the original order shall be correct and consistent to the greatest extent when making the order, so as to reduce the frequent changes in the subsequent process. For booking with the company's seal for booking space, if the accessories for booking space (such as the price confirmation document of the shipping company) need to be provided, they can only be booked with all of them. Obtain the shipping space allocation receipt and extract the ship name, voyage number and B / L number information.