Quality inspection of API standard 650 welded steel storage tanks

Welding certification is regulated by Section 10 of the American Society of Mechanical Engineers (ASME). For both API standard 650 welded steel storage tanks storage tank API 650, non-destructive inspection is required, but third-party inspection is not required.

Our company's logistics breaks through the perspective that the center of transportation service is ability, and emphasizes that the purpose of transportation service is customer first. Customer demand determines the content and mode of transportation service, while production is often small batch, diversified and consumer demand tends to be diversified. In the case of personalization, our logistics service also provides personalized service projects.

The impression of most customers who have cooperated with us on the company is being professional and responsible. That mainly owe to our united and considerate team members. For example, the professional technician, the responsible QC inspector, the experienced sales person, the rigorous document maker, the patient after-sales, etc. Their selfless devotion bring the customer good experience, and bring the company good reputation.

Stamping of API 620 Storage Tank PlatesBefore plates required to be stamped by the steel mill are used, the inspector shall see that they bear the stamp. In laying out and cutting the API standard 650 welded steel storage tanks plates, at least one set of the original material identification markings should, if possible, be left where it will be plainly visible when the tank is completed. Should the identifying marks be obliterateSpot radiographic or ultrasonic examination shall be not less than 6 in. extending along the weld. Spot radiography shall comply with the standards given in 7.15.1.3. Where spot radiographic or ultrasonic examination is applied at joint intersections, the surface shall be prepared and examined for a distance of 3 in. on each side of the intersection, making the minimum length of examination 6 in. on the horizontal weld and 3 in. on the vertical weld.

Have a question? Get a Free Consultation

If you are interested in our storage tanks, you can get contact with us through online consulting, demand table submission, e-mails and telephones.

Corporate Office

High-Tech Development Zone, Zhengzhou, China

Contact us

+86-371-86151527
[email protected]

Send a Message!