In order to prevent the deformation of the bottom of metal vertical lpg gas storage tanks for sale during welding, comprehensive control measures such as strict control of assembly geometry size, reasonable welding procedure, process control of welding deformation and rigid fixation are adopted during assembly welding. The specific methods are as follows:
1. Strictly control welding groove forming of lpg gas storage tanks for sale.
2. Strictly control the size of tank welding seam assembly.
3. Define the welding sequence of tank bottom plate.
4. Reasonable distribution of welders.

Investigation of Subgrade
On actual steel storage tank sites to be used, test borings or test pits, or both, may be made at the direction of a competent engineer who will specify the number and location. They need not be equally spaced but should be laid out to uncover possible weak spots.
In general, test loadings of subgrade at the bottom of test pits need be resorted to only when such heavy loading as may be imposed by footings for major column supports for spheres or similarly elevated API 620 low-pressure tanks is specified. Results may be deceptive if average load-bearing capacity over a considerable area is wanted. All field data shall be recorded with maps, and copies shall be supplied to all engineers concerned with design, erection, and later operation.

Prevent the storage liquid from impacting the inner wall of the API 650 petroleum storage tank or increase the internal pressure, reduce the corrosion of the tank top and the tank wall, and extend the service life of the lpg gas storage tanks for sale storage tank.

In December of 2015, our regular India customer sent us an inquiry for lpg gas storage tanks for sale pipe. The inquiry requires no negative tolerance in both pipes’ outer diameter and pipe wall. After two weeks’ discussion, he put the order of 275 tons to us. The pipes are finished within just one month. Our customer come to our factory to inspect the quality and tolerance, all the products are well meet his demand. The pipes are arriving to Nhava Sheva port, customer is very happy with our products and service during the process.

Have a question? Get a Free Consultation

If you are interested in our storage tanks, you can get contact with us through online consulting, demand table submission, e-mails and telephones.

Corporate Office

High-Tech Development Zone, Zhengzhou, China

Contact us

+86-371-86151527
[email protected]

Send a Message!