Open top API standard 650 SUG II tanks

According to API standard 650, the stairs used for API 650 petroleum storage tanks or thermal insulation tanks should be double longitudinal beams supported by a minimum of ribs. If the gap between the API standard 650 SUG II tanks tank shell and the stringer of the API 650 petroleum storage tank exceeds 200mm, handrails should be provided on both sides of the stairs. Unless otherwise specified, according to API standard 650 SUG II tanks ASTM A123, the following accessories shall be hot-dip galvanized. The damaged zinc coating should be repaired with zinc alloy.

According to the structure type of floating roof, floating roof API standard 650 SUG II tanks can be divided into internal floating roof tank and external floating roof storage tank. The internal floating roof tank is a floating roof tank with tank roof. The top is the combination of dome roof and floating roof, the external is dome roof, and the internal is floating roof. There is no vault on the top of the External floating roof tank, only a top plate floating with the storage liquid. The common feature of the inner floating roof tank and the outer floating roof tank is that both of them can reduce the evaporation loss of the storage liquid.

The tank 20-in. inside-diameter nozzle shown in Figure F-6 is located in solid plate in the sidewall of a cylindrical storage tank 148 ft in diameter in an area where the thickness of the wall plate, tw, is 11/2 in. A corrosion allowance of 0.10 in. is required on all surfaces of the tank exposed to the stored liquid. The total internal pressure, Pl + Pg, at the center of the opening is 24.9 lbf/in.2 gauge. The thickness of the API standard 650 SUG II tanks wall plate, t, required by 5.10.3 for the latitudinal unit forces, T2, acting at this level is 1.44 in.

The impression of most customers who have cooperated with us on the company is being professional and responsible. That mainly owe to our united and considerate team members. For example, the professional technician, the responsible QC inspector, the experienced sales person, the rigorous document maker, the patient after-sales, etc. Their selfless devotion bring the customer good experience, and bring the company good reputation.

Box making, door-to-door: fill in the packing plan: box making time, ship name, voyage number, customs declaration number, transfer port, destination port, gross weight, number of pieces, volume, door point, contact person, telephone number, etc., and arrange the train shift 1-2 days before the closing date (two days before the ship's date). Internal loading: fill in the packing plan: ship name, voyage number, customs declaration number, transfer port, destination port, gross weight, number of pieces, volume, cabin number, etc., and arrange the train shift 1-2 days before the closing date (two days before the ship's date).

Have a question? Get a Free Consultation

If you are interested in our storage tanks, you can get contact with us through online consulting, demand table submission, e-mails and telephones.

Corporate Office

High-Tech Development Zone, Zhengzhou, China

Contact us

+86-371-86151527
[email protected]

Send a Message!