oil tank floating roof flat cover plates

The engineering quality of oil tank floating roof not only affects production and operation, but also affects the life safety of the staff. The factors affecting the oil tank floating roof construction quality are all aspects, any link, any part of the problem will affect the whole project, so the quality management is paid more and more attention. How to ensure the engineering construction quality of oil tank? First, make oil tank floating roof construction technical preparation carefully, understand the design intent, master the construction acceptance specification, and make detailed construction technical disclosure to the construction team.

Impact Test Requirements for Oil storage tanks Primary Components
All oil tank floating roof primary components of 9% or 5% nickel steel shall be impact tested in accordance with Q.2.2.2 through Q.2.2.4. Impact testing is not required for primary components of austenitic stainless steel, nickel alloy, and aluminum materials. Welds in high-alloy (austenitic) stainless steel shall be impact tested if required by Q.6.3.
Impact testing of plates, including structural members made of plate, shall comply with the following:a)Impact test specimens shall be taken transverse to the direction of final plate rolling. b)Charpy V-notch specimens shall be cooled to a temperature of –320°F for A353, A553, and A645 steels for impact testing.

API 650 stipulates that an open tank should be provided with a wind-resistant ring to ensure that the oil tank floating roof tank body maintains its roundness when subjected to wind. There are no hard and fast rules for vault API 650 storage tanks. It can be determined by comparing the equivalent wall height with the maximum height of the unreinforced tank wall.

In December of 2015, our regular India customer sent us an inquiry for oil tank floating roof pipe. The inquiry requires no negative tolerance in both pipes’ outer diameter and pipe wall. After two weeks’ discussion, he put the order of 275 tons to us. The pipes are finished within just one month. Our customer come to our factory to inspect the quality and tolerance, all the products are well meet his demand. The pipes are arriving to Nhava Sheva port, customer is very happy with our products and service during the process.

Have a question? Get a Free Consultation

If you are interested in our storage tanks, you can get contact with us through online consulting, demand table submission, e-mails and telephones.

Corporate Office

High-Tech Development Zone, Zhengzhou, China

Contact us

+86-371-86151527
[email protected]

Send a Message!