ISO 630 Gr E355D plates API 650 SUG II tanks

When as-rolled plate material complies with impact test requirements as specified here, the material need not be normalized. If, as with ASTM A516, the specification prohibits impact test without normalizing but otherwise permits as-rolled plates, the API 620 welded storage tanks material may be ordered in accordance with the above provision and identified as “MOD” for this API modification.One of the most widely used design codes is the API 650 Standard, from the American Petroleum Institute. The main objective of this standards API 650 SUG II tanks is, through the requirements contained in its various sections, to facilitate the purchase and construction of vertical, aboveground, welded fabricated tanks assuring that required safety regulations are met.On August 29th Clients from Senegal visited us-Zhengzhou office and wanted to know more about BBN to build a long relationship. They have a big demand of ship building steel plates with thickness 6mm and thickness 8mm LR AH36 shipping steel API 650 SUG II tanks plates to Senegal Navy, and our strong advantage in offering these ship building steel plates make us begin to build a steady cooperation relationship with Senegal clients BBN has always supplied high quality ship plates with stable supply Soon he placed 15 containers of LR AH36 shipping steel plates to BBN,API 650 SUG II tanks. weld tightness test: remove dirt from the API 650 SUG II tanks weld, apply white powder emulsion, spray kerosene on the other side of the weld after drying. Because of the strong penetration of kerosene, if kerosene is sprayed after 12 hours (under low temperature conditions, the time can be extended), if the surface of the welded seam coated with white emulsion has no spots, the welded seam meets the requirements.If customers have any difficult problems during use of the steel materials, they can contact the company's after-sales service department to feedback the existing problems. The after-sales department will reply as soon as possible to ensure that each customer has a good after-sales experience. Under special circumstances, the after-sales service department will start the problem-solving process, and the engineers in charge of the area will quickly follow up to solve the problem.

Have a question? Get a Free Consultation

If you are interested in our storage tanks, you can get contact with us through online consulting, demand table submission, e-mails and telephones.

Corporate Office

High-Tech Development Zone, Zhengzhou, China

Contact us

+86-371-86151527
[email protected]

Send a Message!