Frangible roof API 650 floating-roof tanks
In order to ensure the safety of the vertical storage tank, API 650 floating-roof tanks, the supplier should inspect the tank carefully before delivery. The failure of the tank body is mainly due to the weld and crack of the product. The inspection of API 650 floating-roof tanks, vertical storage tank weld and microcrack is mainly to inspect the appearance forming quality of weld. The inspection contents include weld leg height, undercut, welding deformation, weld bead, arc pit, weld straightness, etc., as well as the internal quality of weld, such as slag inclusion, porosity, incomplete penetration, crack, incomplete fusion, etc.
API 620 Tank DesignThe designer of these large tanks API 650 floating-roof tanks shall supply the data on superimposed loadings to be assumed for the foundation design or, if there are no foundations, for direct loading on the subgrade. A slab or mat may be provided to support the superstructure and shall be considered to distribute the load more evenly over a lower natural subgrade compared with merely stripping, leveling, and rolling the existing grade.For simple spheroids or tanks of similar design, in which the distribution of the imposed weights shifts because the liquid level in combination with the vapor pressure may change the shape of the tank, the designer shall consider the possibility of such a change.
We should focus on the main problems to be solved and pay attention to efficiency. After receiving the user's quality objection report data, the possible causes, responsible units, compensation amount, etc. of the problem shall be judged based on experience. To have a clear service plan, to be clear about what your main problem is, what technical support is needed, these should be prepared.
Upon completion of API 650 floating-roof tanks construction, provide Purchase with a Vendor's Certification that the tank conforms to the requirements of API 650 and to the additional requirements as specified.