Erection of API 650 insulated tanks

The calculated thickness of the above-mentioned wall panels required by the hydrostatic pressure is also It API 650 insulated tanks should be increased by the same ratio, unless special analysis is performed to determine the seismic overturning moment and the corresponding stress at the bottom of the wall of each layer of API 650 tank. =====
API 650 storage tank stipulates that if the thickness of the lower wall panel obtained by calculating the anti-overturning moment is greater than the thickness of the API 650 insulated tanks hydrostatic pressure test (both do not include the corrosion allowance).

Ningbo port has trade and transportation with more than 50 countries and regions, such as the United States, CIS countries, Europe, Africa, Japan and South Korea, Southeast Asia, the Middle East and Hong Kong. Ningbo port has initially formed an all-round three-dimensional collection and distribution network of expressways, railways, aviation, river sea intermodal transport, water to water transfer, etc.

We can process the steel materials according to your drawing. Or if you can not make drawing, please send us API 650 insulated tanks specific data and requirements, our technical department can make design and drawing for you, and then confirm with your technician or engineer. If all is OK, our processing center will process the steel materials according to the drawing. So no matter what size and shapes you need, we can meet demands at the most time.

Any joints between the adjacent sections of API 620 oil storage tank stiffening rings, as shown in Figure Q-1, shall be made so that the required moment of inertia of the combined ring-shell section is provided. Weld joints between adjacent sections shall be made with full-thickness and full-penetration butt-welds. Stiffening-ring butt-welds may employ metal backing strips. Backing strips and the associated welding shall be made in a manner that provides a smooth contour in the rat hole and all other weld joint ends. All weld passes shall be started at the rat hole and other weld joint ends and shall be completed by moving away from these ends. Passes shall be overlapped away from edges to provide a smooth continuous weld.

Have a question? Get a Free Consultation

If you are interested in our storage tanks, you can get contact with us through online consulting, demand table submission, e-mails and telephones.

Corporate Office

High-Tech Development Zone, Zhengzhou, China

Contact us

+86-371-86151527
[email protected]

Send a Message!