EN 10025 S355J0 plates API 650 open-top tanks
Before the start of erection, inspect each API 650 tank foundation to ensure that it is level and acceptable to receive Work. Remove temporary erection attachments welded to the interior or exterior of the API 650 open-top tanks shell or to the bottom by arc gouging, and grind weld area smooth.
To provide customers with the most satisfactory service and realize the win-win of economic and social benefits, our company promises to provide excellent API 650 open-top tanks products in this bidding, and in line with the attitude of being serious and responsible to customers, before sending goods to users, the API 650 open-top tanks technical personnel shall confirm that there is no fault in the equipment before sending goods to users, and then send goods and products to users, and formulate the following service terms.
Enterprise Motto:Integrity, harmony, dedication, innovation and developmentAbility is the cornerstone of success; action is the ladder of successGrow with the enterprise; progress with the enterpriseGive a platform to those who actually do things and a stage to those who successfully do thingsDare to be the first, to pursue excellence.
Tank cracks are common API 650 open-top tanks defects, mainly including tank wall cracks, internal cracks, weld zone cracks. The reason for these defects may be that the defects not exceeding the standard existed in the early stage of API 650 open-top tanks construction, which become obvious after the later use. Or in the process of using the API 650 open-top tanks, the tank body material generated new defects due to corrosion, pressure, wear and other reasons, and tank cracks.