EN 10025 S355 plates API 650 carbon steel tank
This standard only applies to API 650 storage tanks API 650 carbon steel tank with uniform bottom support and non-refrigerated service storage tanks with a maximum design temperature of not more than 93 degrees Celsius (200 degrees Fahrenheit).
In this project, an area of tank wall is constructed of ASTM A285, Grade C, steel plate that is 5/8-in. thick and has spot-radiographed, double-welded butt joints. The wall is subject to tension in a meridional direction and to compression in a latitudinal direction. The values of R1 and R2 at the point under consideration are 75 in. and 300 in. respectively. A corrosion allowance of 1/16 in. is required. The computed (meridional) tensile stress, stc, in the net thickness after deduction of the corrosion allowance is 6000 lbf/in.2. The problem in this example is to find the maximum allowable (latitudinal) compressive stress value for the given conditions, in conformance with the provisions of API 620 tank standard 5.5.4.5.
Weld inspection of API 650 carbon steel tank, vertical oil tank wall plate: In the welding inspection process of oil tank wall plate, attention should be paid to the defects of thick wall plate, such as incomplete penetration, incomplete root fusion and cracks. If there is a root incomplete penetration defect, it is necessary to open the weld joint with carbon arc air gouging and grinding machine grinding, or even weld through, and then weld again after the defect is removed.
Training is one of the important factors in the construction of corporate culture. Online training system can be used to enable all employees to take advantage of fragmented time and carry out targeted training anytime and anywhere without the limitation of time and region. Through training to improve work skills, at the same time, through training, let all improve their quality education level, let employees work around a goal, create a career, and produce results.
The trend of international shipping development of large-scale ships and strategic joint ventures puts forward higher requirements for modern ports. Modern ports no longer use the general cargo throughput as a measure sign, and container throughput will become the main sign to measure the role and status of modern ports. The average container capacity in 2000 is 3200teu, and it is expected to be 5500teu in 2020.
The after-sales service department will pay return visit to each customer by call or email, report problems found during the return visit in time, and discuss with the production and quality inspection center to propose effective solutions and follow up in a timely manner, so as to ensure the benefits each customer are fully guaranteed, and to provide customers with more value-added services.