double-deck roof API Std 650 special tank
When welding API Std 650 special tank, in order to avoid weld deformation, it is necessary to use corresponding welding process according to the type of steel used in the tank, such as welding requirements of steel plate, welding position, etc. Reasonable arrangement of the assembly sequence, the use of subsection back welding and jump welding method, strict control of welding process parameters, rigid fixation measures, take corrective measures for deformation compensation are necessary.
Above the water level, all API Std 650 special tank welded joints, all welds around openings, and all piping joints against which the pneumatic pressure is acting shall be checked with a solution film. A visual inspection may be substituted for the solution-film inspection if the welded joint has previously been checked with a vacuum box. The solution-film inspection shall still be made, above the water level, on all welds around openings, all piping joints, and the compression ring welds, including the attachment to the roof and shell.
The seismic effects on the tank wall of API 650 oil storage tank include the inertia moment generated by the weight of the API Std 650 special tank tank and the hydrodynamic pressure of the reservoir, which can be divided into short period pulse pressure and long period fluid slopping convective pressure.
Box making, door-to-door: fill in the packing plan: box making time, ship name, voyage number, customs declaration number, transfer port, destination port, gross weight, number of pieces, volume, door point, contact person, telephone number, etc., and arrange the train shift 1-2 days before the closing date (two days before the ship's date). Internal loading: fill in the packing plan: ship name, voyage number, customs declaration number, transfer port, destination port, gross weight, number of pieces, volume, cabin number, etc., and arrange the train shift 1-2 days before the closing date (two days before the ship's date).