Design temperature of API Std 650 self-anchored storage tanks

According to API 650 tanks, anchoring devices should be designed to transfer overturning moments to the API Std 650 self-anchored storage tanks tank foundation. At the same time, according to API 650 tank Appendix F, when the tank is to be anchored, the size of the anchoring parts is determined by the maximum lifting force caused by the internal pressure and wind load or the combination of internal pressure and seismic load.

The preparatory work before the construction of the API Std 650 self-anchored storage tanks is an important part of the oil tank project. Material purchase preparation before the construction of the API Std 650 self-anchored storage tanks:
Before API Std 650 self-anchored storage tanks construction, all materials shall be purchased and prepared, and the specifications and quality of materials shall be inspected to see if they meet the construction operation requirements. Fire and rain proof measures should be taken when storing materials. Paint should be stored in a ventilated and dry place.

Management concept: abide by laws, regulations and social norms. To improve the system of management, to carry out activities with high corporate ethics. Mutual respect, unity and harmony, create a "fair, just and open" good working environment for employees. Forge ahead, constantly pursue new technology innovation, create social value, and become a sustainable growth enterprise.

Box making, door-to-door: fill in the packing plan: box making time, ship name, voyage number, customs declaration number, transfer port, destination port, gross weight, number of pieces, volume, door point, contact person, telephone number, etc., and arrange the train shift 1-2 days before the closing date (two days before the ship's date). Internal loading: fill in the packing plan: ship name, voyage number, customs declaration number, transfer port, destination port, gross weight, number of pieces, volume, cabin number, etc., and arrange the train shift 1-2 days before the closing date (two days before the ship's date).

Have a question? Get a Free Consultation

If you are interested in our storage tanks, you can get contact with us through online consulting, demand table submission, e-mails and telephones.

Corporate Office

High-Tech Development Zone, Zhengzhou, China

Contact us

+86-371-86151527
[email protected]

Send a Message!