CSA G40.21 Gr 350W plates API standard 650 self-anchored storage tanks
BBN can provide design, manufacture and installation of API 650 large oil and crude oil storage tanks. We can build a API standard 650 self-anchored storage tanks 7,000,000 gallon API 650 petroleum storage tank. In addition, BBN has the means to construct multiple storage tanks at the same time. We are very experienced in providing API 650 petroleum storage tanks.
Prefabrication requirements of API standard 650 self-anchored storage tanks, large vertical storage tank wall panels:1. The prefabrication of wall panel shall be processed in strict accordance with the requirements of the drawings, and inspection records shall be made.2. After the wall panel is rolled, it should be placed on the platform for inspection with a template. In the vertical direction, use a straight-line template to check, the gap should not be greater than 2 mm, and in the horizontal direction, use an arc-shaped template to check, and the interval should not be greater than 4 mm.3. When wall panels are rounded, attention should be paid to prevent irreversible plastic deformation caused by external forces. After rolling, it should be placed on the platform for inspection, and then placed on the prepared mold.
Bearing on FoundationsFoundations shall preferably be designed to resist the load exerted by the API Standard 620 tank and its contents when the tank is filled with water to the design liquid level. Foundations shall be designed at least for the maximum operating conditions including the wind load. During the API standard 650 self-anchored storage tanks water test, the total load on the foundation shall not exceed 125% of the allowable loading. If necessary, the water level during the test may be reduced below the design liquid level line so as not to exceed the 25% maximum overload (see Q.8.1.2).
The business department is mainly responsible for communicating with customers, from the manufacturing of steel plates, steel pipes and other products, knowing customers' needs and processing conditions, etc. within the time agreed with customers, the delivery time is short, the price is the most competitive, and the service is the best. Their responsibilities are to deal with customer consultation, solve customer problems, update production plans, and instruct the logistics department to deliver products to customers.
Tianjin warehouse mainly stores steel plates and steel pipes. The monthly replenishment is about 12000 tons. Our inventory cycle is short and flexible. Shanghai warehouse mainly stores API standard 650 self-anchored storage tanks ,steel plate and section steel. The average monthly purchase volume is about 15000 tons. The geographical location of the warehouse has greatly improved our performance in terms of transportation and delivery time.