ASTM A53 pipe API Std 650 welded steel oil storage tanks
The API 650 specification provides guidelines for the API Std 650 welded steel oil storage tanks design, manufacturing, materials, installation and inspection of welded vertical and cylindrical tanks. Such containers must be on the ground and have a closed or open top.
The water dissolved in the oil will be separated out from the oil stored in the API Std 650 welded steel oil storage tanks for a long time, and the acidic water layer will appear at the bottom of the API Std 650 welded steel oil storage tanks for a long time, which will accelerate the corrosion of the API Std 650 welded steel oil storage tanks and cause the wall thinning and even leakage. With the increase of service life, the API Std 650 welded steel oil storage tanks must be inspected and cleaned regularly to check the hidden danger.
Facilities for API 620 Storage Tanks InspectorThe manufacturer shall afford the inspector all reasonable facilities for testing and inspection and shall provide mutually agreeable advance notification to permit the examiner to witness all tests of the equipment and materials during fabrication, including all laboratory tests of the material to be used and all hydrostatic and pneumatic tests at the site of erection.The API Std 650 welded steel oil storage tanks inspector shall be permitted free access to all parts of the plant concerned with the manufacture of the tank during fabrication and to all parts of the plants of material suppliers who are concerned with the manufacture of materials to be used in the tank.
The company's sales department has a professional team, they have professional steel knowledge, respond quickly, with the problems raised by customers can quickly give solutions, put the interests of customers first. With their own professional knowledge to provide customers with high-quality steel plate in line with the requirements. At the same time, in terms of price, we also have great advantages. Members of the business department make sure that the delivery time is short and the service is the best.
Box making, door-to-door: fill in the packing plan: box making time, ship name, voyage number, customs declaration number, transfer port, destination port, gross weight, number of pieces, volume, door point, contact person, telephone number, etc., and arrange the train shift 1-2 days before the closing date (two days before the ship's date). Internal loading: fill in the packing plan: ship name, voyage number, customs declaration number, transfer port, destination port, gross weight, number of pieces, volume, cabin number, etc., and arrange the train shift 1-2 days before the closing date (two days before the ship's date).