ASTM A334 pipe API 650 self-anchored tank
Compared with the fixed roof API 650 oil storage tank without API 650 self-anchored tank floating roof, there is no evaporation space. In principle, this eliminates the so-called "large breathing loss". Evaporation not only causes the loss of product quantity, but also affects the quality of API 650 self-anchored tank product and pollutes the environment.
Cylindrical Oil Storage Tanks Discharge PipesWhen a discharge pipe is used on the outlet side of such relieving devices, its area shall be not less than the area of the valve outlet, or if a single pipe provides for discharge from several relief devices, its area shall be not less than the aggregate area of the valve outlets. The API 650 self-anchored tank discharge pipe shall be fitted with an open drain to prevent water or other liquids from lodging in the discharge side of the valves.Discharge pipes shall be supported so that no undue stress is placed on the valve body. Open discharges shall be placed and oriented so that the outflow is directed away from the tank and will not create a hazard over walkways, stairways, or operating platforms.
Usually, the soil resistance of the foundation should be considered before the design and construction of API 650 self-anchored tank. The soil endurance in the API 650 self-anchored tank construction area plays a decisive role in the basic cost of the tank. In areas with high soil resistance, not only the cost of foundation treatment can be greatly reduced, but also the ratio of height to diameter of storage tank can be obtained. Therefore, the investment cost of the API 650 self-anchored tank can be greatly saved in the area with large soil resistance.
The company always adheres to the concept of green production, follows the development path of innovation, transformation and improvement, and has carried out in-depth cooperation with Zhengzhou University and other scientific research institutes, planning from a high starting point, strict standard design, and successfully implementing engineering projects With nearly 20 research and development projects, the company's production technology and equipment are at the forefront of the industry, and indicators such as environmental protection, energy consumption, cost, and resource utilization have reached the advanced level in the industry.
The company's headquarters has a well-established logistics distribution system, which can quickly transport the steel materials to the port through the contracted logistics companies. Professional contracted logistics companies can significantly reduce costs and various commodity-related expenses. Meanwhile, the flexible transfer ensures that the API 650 self-anchored tank steel materials can be shipped immediately after passing the quality inspection.
Our company will accept the product quality objection registration record, pass it to the API 650 self-anchored tank production unit and relevant departments, and timely coordinate the supervision of product API 650 self-anchored tank quality objection. Our company coordinates the relevant department personnel to the customer unit to carry on the investigation, the processing.