API 650 sets minimum requirements for the design, material, construction, and testing for aboveground, open and closed-top, cylindrical API 650 stainless and carbon steel tank steel storage tanks in different capacities and sizes, roughly equating to the pressure of the atmosphere (not greater than the weight of the roof plates).
Investigation of SubgradeOn actual steel storage tank sites to be used, test borings or test pits, or both, may be made at the direction of a competent engineer who will specify the number and location. They need not be equally spaced but should be laid out to uncover possible weak spots.In general, test loadings of subgrade at the bottom of test pits need be resorted to only when such heavy loading as may be imposed by footings for major column supports for spheres or similarly elevated API 620 low-pressure tanks is specified. Results may be deceptive if average load-bearing capacity over a considerable area is wanted. All field data shall be recorded with maps, and copies shall be supplied to all engineers concerned with design, erection, and later operation.
Natural ventilation loss: the main cause of natural ventilation loss is that the API 650 stainless and carbon steel tank is not tightly sealed. This is usually due to corrosion perforation on the top of the oil tank, or there is a height difference between the two orifices. The air tightness of the mixture in the API 650 stainless and carbon steel tank is higher than that of the air, which causes the mixture gas in the tank to be discharged into the atmosphere from the lower hole, and the external air flows into the tank from the high hole, resulting in natural ventilation loss.
Company through its own API 650 stainless and carbon steel tank website, multimedia, radio, newspapers, the group, the handbook of the corporate culture carrier, approved and publicity column, in-depth to carry out enterprise culture construction, also through photography, painting, calligraphy, cartoon, speech, and the songs of the enterprise design, various cultural and sports activities to carry out enterprise culture construction.
"Efficiency is benefit, time is money", the company is equipped with a high standard logistics team. After the products pass the factory inspection, they will coordinate the shipment as soon as possible according to customer requirements and schedules to hand over the booked steel materials to customers at the first time, to ensure no delay of customer's project progress, to strive for more project preparation time for customers.
Compared with other fast-moving consumer goods, steel consumption is obviously different, with a wide range of use and a long service life. Therefore, the quality and service of steel materials are particularly important. Service is always one of our top concerns, especially after-sales service. We have mature after-sales service team, and can help you solve problems professionally during application of the steel materials.