ASTM A181 forgings API 650 aluminum tanks
The company has a group of mature steel plate production and processing line construction and production management experience. In addition, the company has professional and technical personnel. BBN steel is a modern enterprise integrating scientific research and development, production processing, sales and service. The company now has finance department, production department, sales team, technical department, quality control department, logistics department and after-sales service team. At the same time, it also adheres to international standards and adheres to the international line.The hardness of the welds contacting these environments, including the heat-affected zones, shall be considered. The weld metal and adjacent heat-affected zone often contain a zone of hardness that is well in excess of a value of 22 on the Rockwell C scale and could be expected to be more susceptible to cracking than would unwelded metal. Any hardness criteria shall be a matter of agreement between the Purchaser and the API 650 aluminum tanks manufacturer and shall be based on an evaluation of the expected hydrogen sulfide concentration in the product, the possibility of moisture being present on the inside metal surface, and the strength and hardness characteristics of base metal and weld metal.According to API 650 tanks, anchoring devices should be designed to transfer overturning moments to the API 650 aluminum tanks tank foundation. At the same time, according to API 650 tank Appendix F, when the tank is to be anchored, the size of the anchoring parts is determined by the maximum lifting force caused by the internal pressure and wind load or the combination of internal pressure and seismic load."Hard and solid, honest commitment, practical effect". To strive for a solid enterprise foundation with hard work style; to promise first-class enterprise service with honest faith; to create efficient enterprise performance with practical spirit.Prefabrication requirements of API 650 aluminum tanks, large vertical storage tank wall panels:1. The prefabrication of wall panel shall be processed in strict accordance with the requirements of the drawings, and inspection records shall be made.2. After the wall panel is rolled, it should be placed on the platform for inspection with a template. In the vertical direction, use a straight-line template to check, the gap should not be greater than 2 mm, and in the horizontal direction, use an arc-shaped template to check, and the interval should not be greater than 4 mm.3. When wall panels are rounded, attention should be paid to prevent irreversible plastic deformation caused by external forces. After rolling, it should be placed on the platform for inspection, and then placed on the prepared mold.
Latest NewsMore+