API Std 650 welded tanks for oil storage vents
Accept the inquiry from the owner of the goods and the inquiry by sea: master the port and price from the port of shipment to all continents and routes, and the port and price that the owner often needs to serve; the shipping schedule information of the main shipping companies; when necessary, ask the owner of the inquiry for some category information, such as the name of the goods, the level of danger, etc. (water hazard code).The API 650 oil tank stiffener ring and backing strip, if used, are primary components, and they shall comply with the requirements of R.2.1. The API Std 650 welded tanks for oil storage stiffener ring may be fabricated from plate using an intermittent weld on alternating sides between the web and the flange. One rat hole with a minimum radius of 3/4 in. shall be provided at each longitudinal shell joint and ring juncture weld.BBN steel strictly control quality of our carbon steel plate, alloy steel plates and structural steel plates. For API Std 650 welded tanks for oil storage ASTM A572 Grade 50 structural steel plate, Our Q/C Department will inspect dimension before shipment, making sure structural steel plate thickness tolerance and width, length tolerance are matchable to the API Std 650 welded tanks for oil storage standard requirements. The company is a good ASTM A572 Grade 50 structural steel plate supplier in the globle market and the head is located in China. Welcome to send us inquiry and questions about structural steel plate.Compared with the fixed roof API 650 oil storage tank without API Std 650 welded tanks for oil storage floating roof, there is no evaporation space. In principle, this eliminates the so-called "large breathing loss". Evaporation not only causes the loss of product quantity, but also affects the quality of API Std 650 welded tanks for oil storage product and pollutes the environment.Prefabrication requirements of API Std 650 welded tanks for oil storage, large vertical storage tank wall panels:1. The prefabrication of wall panel shall be processed in strict accordance with the requirements of the drawings, and inspection records shall be made.2. After the wall panel is rolled, it should be placed on the platform for inspection with a template. In the vertical direction, use a straight-line template to check, the gap should not be greater than 2 mm, and in the horizontal direction, use an arc-shaped template to check, and the interval should not be greater than 4 mm.3. When wall panels are rounded, attention should be paid to prevent irreversible plastic deformation caused by external forces. After rolling, it should be placed on the platform for inspection, and then placed on the prepared mold.
Latest NewsMore+