API Std 650 welded storage tanks tank-bottom reinforcing plate
The API Std 650 welded storage tanks stiffener ring and backing strip (if used) are primary components, and they shall comply with the requirements of API 620 storage steel tank Q.2.1. The stiffener rings may be fabricated from plate using an intermittent weld on alternating sides between the web and the flange.Except for aluminum or stainless steel tanks, all fillet welds shall consist of a minimum of two passes. The ends of the fillet welds shall be 2 in. from the rat hole (see Figure Q-1), and these welds shall be deposited by starting 2 in. from the rat hole and welding away from the rat hole. An acceptable alternative to the detail that includes stopping fillet welds 2 in. short of the rat hole would be to weld continuously through the rat hole from one side of the stiffener to the opposite side. All craters in fillet welds shall be repaired by back welding.
Design calculations and drawings required API Std 650 welded storage tanks for the fabrication and erection of each API 650 tank. A drawing index for each API 650 tank is required and shall be re-submitted each time drawings are revised and re-issued.
Square hollow section S355J2H to Turkey. In January of 2015, our customer from Turkey chose us as their supplier of seamless RHS EN10219 S355J2H with a trail order of 120 tons. They required DNV test for the MTC and each tube. DNV inspector tested all the tubes and MTC. When our customer received the reports, they gave us a second order of 852.5 tons. Since then we maintain a long time cooperation relationship.
}For the welding of API Std 650 welded storage tanks bottom, attention should be paid to the slag removal and drying of the welding joint before welding, and there is no sediment and oil contamination in the lap joint of steel plate. The manufacturing quality and production efficiency of the central plate can be obviously improved by adopting the rolling central plate. The butt joint is used between the rolling plates to improve the installation conditions of the central plate at the bottom of the API Std 650 welded storage tanks. The welding sequence of the central plate is from the center of the central plate to the surrounding.
The after-sale service of iron and steel products includes after-sale tracking service, technical guidance, transfer of relevant bills, handling of objections and many other contents. The handling of quality objections accounts for a large proportion. When dealing with these problems, we should distinguish the responsibilities, and compensate or return the inconvenience or loss caused to users due to steel.