API Std 650 SUG I tanks level gauge

The preparatory work before the construction of the API Std 650 SUG I tanks is an important part of the oil tank project. Material purchase preparation before the construction of the API Std 650 SUG I tanks:
Before API Std 650 SUG I tanks construction, all materials shall be purchased and prepared, and the specifications and quality of materials shall be inspected to see if they meet the construction operation requirements. Fire and rain proof measures should be taken when storing materials. Paint should be stored in a ventilated and dry place.

The opening pressure or vacuum of the pressure relief and API Std 650 SUG I tanks vacuum relief valves shall be checked by pumping air above the water level and releasing the pressure and then partially withdrawing water from the tank. After the tank has been emptied of water and is at atmospheric pressure, the anchorage, if provided, shall be rechecked for tightness against the hold-down brackets. Air pressure, equal to the design pressure, shall be applied to the empty tank, and the anchorage, if provided, and the foundation shall be checked for uplift.

The technology center has always been focusing on application research, improving market realization and scientific and technological contribution rate; taking user demand as the goal, highlighting the personalized development of products; taking the joint development of industry, University and research, and technology integration as the means, improving the starting point and level of innovation, and realizing the breakthrough of core technology; taking advanced research as the guide, pursuing the leap of technological development.

In API 650 oil storage tank, when the mixing ratio of combustible medium and air reaches a certain limit, it is easy to cause explosion. Therefore, it is necessary to add API Std 650 SUG I tanks external floating roof to open cylindrical steel API Std 650 SUG I tanks tank. At present, the external floating roof is most suitable for large-scale API 650 oil storage tank in China, ranging from 20000, 30000, 50000 cubic meters to 100000 cubic meters.

Have a question? Get a Free Consultation

If you are interested in our storage tanks, you can get contact with us through online consulting, demand table submission, e-mails and telephones.

Corporate Office

High-Tech Development Zone, Zhengzhou, China

Contact us

+86-371-86151527
[email protected]

Send a Message!