API Std 650 stainless steel storage tanks contract

storage tanks API Std 650 stainless steel storage tanks designed in accordance with the rules and guidelines of API 650 are called API 650 storage tanks. API 650 is a control rule for welded storage tanks that work normally in the normal pressure range.

The impact tests for API 620 welded storage tanks used pipe (including structural members made of pipe), bolting, and forgings, shall be in accordance with ASTM specifications ASTM A333 (seamless only) pipe, ASTM A36 Mod 1 plate, ASTM A131 Grades CS, D, and E steel plate, ASTM A633 Grade A CSA G40.21 Grades 38WT, 44WT and 50WT high-strength low-alloy structural steel plate, ASTM A350 carbon and low alloy steel forgings, and ASTM A320 Grade L7 bolts.

The main reason of "small breathing" loss of API Std 650 stainless steel storage tanks is the change of atmospheric temperature. When the temperature rises with the increase of solar radiation from dawn, the temperature of oil in the API Std 650 stainless steel storage tanks also changes, resulting in the acceleration of evaporation speed and the increase of evaporation pressure. When the pressure exceeds the positive pressure rating of the breathing valve, the oil-gas mixture in the API Std 650 stainless steel storage tanks is discharged into the atmosphere through the breathing valve, which is the "exhalation" process of the oil tank.

Management concept: integrity is the cornerstone, talent is the foundation, and service is the key.Business philosophy: to keep faith, to win by quality, customer first, win-win development.Based on integrity, win customers with good reputation, win competition with excellent product quality, improve service with customer orientation, and pursue the goal of win-win development in cooperation with customers.Sincerely welcome customers to visit and negotiate business.

Box making, door-to-door: fill in the packing plan: box making time, ship name, voyage number, customs declaration number, transfer port, destination port, gross weight, number of pieces, volume, door point, contact person, telephone number, etc., and arrange the train shift 1-2 days before the closing date (two days before the ship's date). Internal loading: fill in the packing plan: ship name, voyage number, customs declaration number, transfer port, destination port, gross weight, number of pieces, volume, cabin number, etc., and arrange the train shift 1-2 days before the closing date (two days before the ship's date).

The company strengthens process management and pays attention to assessment. One of the key points of good service is to strengthen the process management and improve the evaluation mechanism. Make the after-sales service system more perfect and provide better service for customers.

Have a question? Get a Free Consultation

If you are interested in our storage tanks, you can get contact with us through online consulting, demand table submission, e-mails and telephones.

Corporate Office

High-Tech Development Zone, Zhengzhou, China

Contact us

+86-371-86151527
[email protected]

Send a Message!