API Std 650 self-anchored flat-bottom tanks roof loads
The floating roof is the top cover floating on the liquid level, so the sealing performance of API Std 650 self-anchored flat-bottom tanks API 650 oil storage tank is very important. The floating plate mainly adopts elastic packing, and at the same time, it is compressed with the wall of API 650 oil storage tank with pressure strip around, and fixed with the floating plate with bolts. After the API Std 650 self-anchored flat-bottom tanks floating plate is lowered to a certain position of about 1.8m, a prop will support the floating plate to keep it in position.
Requirements for prefabrication of the top of large vertical API Std 650 self-anchored flat-bottom tanks: The prefabrication of the tank top shall be prefabricated in blocks according to the drawings. Pay attention to the spacing of the welds after installation when setting out the material. Reinforcing ribs should be formed and inspected with an arc-shaped template. When a single top plate needs to be spliced, butt joints should be used. The forming of a single top plate should be welded between the reinforcing ribs and the top plate on the mould. After forming, check with an arc-shaped sample plate, and the gap should not be greater than 10 mm.
Large Steel Storage Tank AnchorageIn addition to the loads in API 620 oil storage tank Q.4, Q.5.1, and Q.5.2, the anchorage for the tank that contains liquid, whether it be a single-wall tank or the inner tank of a double-wall tank, shall be designed to meet the requirements of Q.3.6.2 through Q.3.6.5. The anchorage shall accommodate movement of the tank wall and bottom caused by thermal changes. For anchored flat-bottom tanks, the anchorage shall be designed as described in Q.3.6.4.1 through Q.3.6.4.3.
BBN company team and culture: tt the end of 2019, in order to thank employees for their hard work and enrich their sparetime lives, the company organized a pleasant trip to Phuket Island, Thailand. This tour lasted 6 days and 5 nights, and returned by plane on the evening of December 27. We took off in Zhengzhou at about 5o'clock in the afternoon on the 22th December. Let's seize the day and live it to the full, and greet the arrival of the year 2020 together.
The company uses outsourced logistics operations. Our cooperated professional third-party logistics providers use the advantages of large-scale production and cost advantages to achieve cost savings by increasing the utilization of resources in each link, so that we can benefit from the separation of cost structure. Therefore, we can also provide customers with better, faster and more efficient cargo transportation, delivery, and lower freight costs.