API Std 650 self-anchored flat-bottom tanks anchorage
API Std 650 self-anchored flat-bottom tanks Visual InspectionUpon completion of all the foregoing tests, the pressure in the tank shall be released and a thorough visual inspection shall be made of both the inside and outside of the tank, giving particular attention to all internal ties, braces, trusses, and their attachments to the walls of the tank. Anchors shall be checked for snug tightness and adjusted if required. Anchor threads shall be fouled by peening or tack welding to prevent loosening. In lieu of thread fouling, double nuts may be used.Rate of Water Filling and Water TemperatureThe rate at which water is introduced into a tank for a hydrostatic test shall not exceed 3 ft of depth per hour. The foundation, venting equipment, or other conditions may limit the water filling to a lower rate. Pressure shall not be applied above the surface of the water before the tank and its contents are at about the same temperature.
The thickness of the overburden on the top of the API 650 oil tank should not be less than 0.5m. The surrounding backfill with clean sand or fine soil should be no less than 0.3m thick; the API 650 oil tank API Std 650 self-anchored flat-bottom tanks operation platform ladder selection unit is considered in a unified manner. The buried operation well is designed for buried horizontal oil tanks, and the two are compatible.
In April 2018, our Philiphine customer purchased 1008 Tons API5L Gr.B ERW&Q345B SMLS pipe for offshore oil field resources drilling project. This is a regular demand almost two month, and we has been cooperated more than three times, totally around 2100 tons steel pipe since 2015 year.
}Prefabricating API Std 650 self-anchored flat-bottom tanks components before construction can improve construction efficiency, save time and cost, and is currently a common method for the construction of large vertical storage tanks. The main prefabricated components of a large vertical API Std 650 self-anchored flat-bottom tanks include the tank body, the storage tank wall, the top of the storage tank, the bottom of the storage tank, and the accessories of the storage tank. The prefabrication of the components should follow a reasonable workflow, and carry out appropriate heat treatment and testing, so as to improve manufacturing accuracy.
After sales service support personnel pay attention to commitment in their work. In the process of people to people communication, mutual trust is an important factor for the long-term and stable communication. After sales service personnel must do what they say in the process of communication with customers.