API Std 650 ground supported liquid storage tanks material requirements
API 650 storage tank, double-layer oil tank environmental protection advantages: ordinary single-layer steel API Std 650 ground supported liquid storage tanks oil tank is corroded by underground water and gas and electrolytic corrosion because it is buried underground all year round. The API 650 tank has a double-layer structure with a gap of 0.1 mm. The API Std 650 ground supported liquid storage tanks outer layer of FRP ensures that the leakage will not directly leak into the soil and water source.
High temperature heat transfer oil fin tube heating device for large API Std 650 ground supported liquid storage tanks has the advantage of reducing the leakage of heating coils. The heating medium of the large storage tank heating device is high-temperature heat-conducting oil. The boiling point of the heat-conducting oil is high, usually higher than 200°C. At high temperatures, the pressure on the heat-conducting oil circulation pipeline is very small, which greatly reduces the occurrence of heating coil leakage accidents. At the same time, the temperature difference between the inside and outside of the tube is guaranteed.
Shell Stiffening Rings for Tanks That Contain LiquidInternal or external shell stiffening rings may be required to maintain roundness when the tank is subjected to wind, vacuum, or other specified loads. When API Std 650 ground supported liquid storage tanks stiffening rings are required, the stiffener-to-shell weld details shall be in accordance with Figure Q-1 and Q.3.5.2 through Q.3.5.5.Three-plate laps or butt-weld junctions in tank bottoms shall be not closer than 12 in. from each other or from the butt-welds of the annular plates.Bottom plates, other than annular bottom plates for a 9% or 5% nickel steel or stainless steel tank that contains liquid, may have a minimum thickness of 3/16 in. exclusive of any specified corrosion allowance.
BBN company team and culture: tt the end of 2019, in order to thank employees for their hard work and enrich their sparetime lives, the company organized a pleasant trip to Phuket Island, Thailand. This tour lasted 6 days and 5 nights, and returned by plane on the evening of December 27. We took off in Zhengzhou at about 5o'clock in the afternoon on the 22th December. Let's seize the day and live it to the full, and greet the arrival of the year 2020 together.
The company's logistics and transportation department is responsible for developing high-quality third-party logistics companies, to coordinate and follow up the situation of steel materials transportation. Third-party logistics companies provide us with professional logistics services. With this logistics management method, the time for delivery of steel materials is faster, and the logistics service is professional, multifunctional and comprehensive.