API Std 650 cylindrical tanks annular plates
Tanks which are designed following rules and guidelines of API 650 are API 650 tanks. API 650 API Std 650 cylindrical tanks is the governing code for Welded tanks for Oil storage normally operating in the atmospheric pressure range. The code API 650 provides guidelines for design, fabrication, material, erection, and inspection of welded vertical and cylindrical storage tanks. Such API Std 650 cylindrical tanks Tanks must be above ground with a closed or open top.
The preparatory work before the construction of the API Std 650 cylindrical tanks is an important part of the oil tank project. Material purchase preparation before the construction of the API Std 650 cylindrical tanks:Before API Std 650 cylindrical tanks construction, all materials shall be purchased and prepared, and the specifications and quality of materials shall be inspected to see if they meet the construction operation requirements. Fire and rain proof measures should be taken when storing materials. Paint should be stored in a ventilated and dry place.
Preheating should be performed by heating and maintaining this heat in appreciable lengths of the joint to be welded, preferably using a strip burner with a mild flame rather than a harsh flame such as that from a cutting torch. Electrical strip heaters are available and have been found to be satisfactory. The preheat of 300°F should be checked with a temperature-sensitive crayon, or similarly accurate means, so that the steel 4 in. (or four times the API Std 650 cylindrical tanks plate thickness, whichever is greater) on each side of the joint will be maintained at the minimum preheat temperature. Ring burners or heaters are recommended for nozzle and manway welds. At no time during the welding should the base metal fall below a temperature of 300°F.
BBN company team and culture: tt the end of 2019, in order to thank employees for their hard work and enrich their sparetime lives, the company organized a pleasant trip to Phuket Island, Thailand. This tour lasted 6 days and 5 nights, and returned by plane on the evening of December 27. We took off in Zhengzhou at about 5o'clock in the afternoon on the 22th December. Let's seize the day and live it to the full, and greet the arrival of the year 2020 together.
Facing the new situation and facing new goals, the company revolves around the sixteen-character development policy of “prioritizing production preservation, society-oriented, market operation, and brand creation and efficiency”. Layout the country in accordance with the modern logistics model, and accelerate the establishment of a modern integrated steel enterprise integrating steel storage, transportation, processing, and distribution.