API Std 650 anchored tanks examiner

Before pressure test, the main drain hose system of API 650 petroleum storage tank floating roof should be thoroughly flushed. Provide blind flanges, gaskets and bolts required for the API Std 650 anchored tanks test (other types of covers are also required if necessary). Covers for maintenance shall be provided in accordance with the interfaces specified by API 650 petroleum storage tanks, and these seals shall remain in place after the test; and for those interfaces that are not provided for maintenance covers, the covers can be removed after the API Std 650 anchored tanks test.

All oil tanks have service life. Due to the pressure of the oil stored on the tank and the corrosion of the oil and external environment on the tank, the oil storage tank will gradually become thin or crack after a long time. Due to the different materials and environment of API Std 650 anchored tanks, the consumption of API Std 650 anchored tanks is different, so it should be taken into account when evaluating the remaining service life of API Std 650 anchored tanks.

We have Business Department, Transportation Department, Document Department, Shipping Department, E-C department, Procurement Department, Finance Department, Human Resources Department, Administration Department, Logistics Department, After-sales so on Departments. Each department performs its own duties, unites and cooperates, and contributes its greatest strength to the overall operation of the company. So as to ensure the stable and sustainable development of the company.

Have a question? Get a Free Consultation

If you are interested in our storage tanks, you can get contact with us through online consulting, demand table submission, e-mails and telephones.

Corporate Office

High-Tech Development Zone, Zhengzhou, China

Contact us

+86-371-86151527
[email protected]

Send a Message!