API Std 650 aboveground welded storage tanks platforms, walkways, and stairways
Welding certification is regulated by Section 10 of the American Society of Mechanical Engineers (ASME). For both API Std 650 aboveground welded storage tanks storage tank API 650, non-destructive inspection is required, but third-party inspection is not required.
Crack treatment of API Std 650 aboveground welded storage tanks weld area: find out the crack tip with ray or ultrasonic flaw detection, drill cut-off holes at both ends of the crack with the cut-off method, the hole depth is slightly greater than the crack depth, or groove (crack stop groove) is made by angle grinder at both ends of the crack, shovel and grind the whole crack, and grind it into a suitable groove; use radiographic inspection and dye detection to verify that the crack has been completely excavated, and finally repair welding.
API Std 650 aboveground welded storage tanks any joints between the adjacent sections of stiffening rings, as shown in Figure R-1, shall be made so that the required moment of inertia of the combined ring-shell section is provided. Weld joints between adjacent sections shall be made with full-thickness and full-penetration butt-welds. Stiffening-ring butt-welds may employ metal backing strips. Backing strips and the associated welding shall be made in a manner that provides a smooth contour in the rat hole and all other weld joints ends. All weld passes shall be started at the rat hole.
The impression of most customers who have cooperated with us on the company is being professional and responsible. That mainly owe to our united and considerate team members. For example, the professional technician, the responsible QC inspector, the experienced sales person, the rigorous document maker, the patient after-sales, etc. Their selfless devotion bring the customer good experience, and bring the company good reputation.
The company has huge steel API Std 650 aboveground welded storage tanks products stock all the year round to meet the urgent needs of customers. For stock products, we can arrange delivery within 3 days. The transportation department and shipping department shall coordinate and follow up to update the progress to customers regularly, i.e. where the goods have arrived, so as to let customers not worry and rest assured. Think about what the customers think and what the customers are anxious about, solve problems for customers efficiently and effectively, is the direction of our unremitting efforts.