API Std 650 aboveground welded storage tanks greater than 60 m in diameter
For areas with high groundwater levels, the operator should take anchoring and anti-floating measures for buried horizontal API Std 650 aboveground welded storage tanks oil tanks; API 650 oil tanks can be used for heavy fuel oil, heaters are separately designed, and buried tank material outlets are installed with bottom valves and connections. consider.
Production Weld TestsProduction weld test plates shall be welded for API Std 650 aboveground welded storage tanks primary-component butt-welded shell plates when welding procedure qualifications are required to be impact tested per Q.6.2 and Q.6.3. The number of production weld tests shall be based on the requirements of Q.6.6.3 and Q.6.6.4. The locations impact tested (i.e., HAZ and/or weld deposits) shall likewise be the same as required for weld procedure qualifications per Q.6.2 and Q.6.3. Weld testing shall be in accordance with Q.6.6.5. Test plates shall be made from plates produced only from the heats that are used to produce the shell plates for the large welded steel tank.
Adhere to the spirit of quality first and user foremost, carry out maintenance and other work according to the requirements of the buyer's contract, and ensure that the engineering project and product after-sales play their application effectiveness. Our company guarantees to carry out self inspection and self supervision according to the quality management policy proposed by our company, and deliver a high-grade, perfect and excellent system engineering to users.
When talking about our team, it is hard not to mention our QC department (Quality Control). We have built strict qualitycontrol system to guarantee the steel quality. During the steel materials production, we have strict monitoring measures and indicators, and ensure no chemical composition, mechnical properties and so on technical problems for the steel materials API Std 650 aboveground welded storage tanks. After production, our QC department will conduct another inspection regarding to the steel quantity, dimension, mark and so on points before delivery.