API Std 650 aboveground oil storage tanks shell nozzles

The thickness of the API Std 650 aboveground oil storage tanks annular bottom plates shall be in accordance with Table Q-4 (for steel or aluminum, as applicable). The thicknesses shown are minimums. The ring of annual plates shall have a circular outside circumference, but it may have a regular polygonal shape inside the tank shell with the number of sides equal to the number of annular plates. These pieces shall be butt-welded in accordance with Q.7.1.1, Item b. The plates of the first shell course shall be attached to the annular bottom plates by a weld as required by API 620 oil tank 5.9.5 except when a full-penetration weld is used or required (see Q.7.1.1). Butt-welds in annular plates shall be not closer than 12 in. from any vertical weld.The API 650 petroleum storage tank standard is one of the most widely used design specifications. It is the API 650 standard of the American Petroleum Institute. The main goal of the API 650 standard is to promote the purchase and construction of vertical, above-ground, and welded manufacturing API Std 650 aboveground oil storage tanks tanks through the requirements contained in its parts to ensure that the required safety regulations are met.In 2016. Our company offer 1200 tons API 5L GR.B hot rolled coil to Bangladesh——100 tons for 3.9*625mm, and 1100 tons for 7*683mm. It is one tender project, we get the tender at the end of 2015, and arrange the production in 2016. They required the tolerance of thickness is +0.1/-0.2mm, and width tolerance is +/-0.5mm, which is a very high requirement for coil tolerance, but our mill handling this very well. and our Q/C department witness all of the process.Crack treatment of API Std 650 aboveground oil storage tanks weld area: find out the crack tip with ray or ultrasonic flaw detection, drill cut-off holes at both ends of the crack with the cut-off method, the hole depth is slightly greater than the crack depth, or groove (crack stop groove) is made by angle grinder at both ends of the crack, shovel and grind the whole crack, and grind it into a suitable groove; use radiographic inspection and dye detection to verify that the crack has been completely excavated, and finally repair welding.The after-sales service department will pay return visit to each customer by call or email, report problems found during the return visit in time, and discuss with the production and quality inspection center to propose effective solutions and follow up in a timely manner, so as to ensure the benefits each customer are fully guaranteed, and to provide customers with more value-added services.

Have a question? Get a Free Consultation

If you are interested in our storage tanks, you can get contact with us through online consulting, demand table submission, e-mails and telephones.

Corporate Office

High-Tech Development Zone, Zhengzhou, China

Contact us

+86-371-86151527
[email protected]

Send a Message!