API standard 650 welded storage tanks structural member attachment
The effect of air pressure on the API standard 650 welded storage tanks tank walls of the API 650 tank must be considered when the design pressure is greater than 2 kPa.The fixed point method can be used to design the tank wall of atmospheric or micro internal pressure API standard 650 welded storage tanks storage tank.
Allowable compressive stresses shall be in accordance with 5.5.4 except that for aluminum alloy plate the allowable compressive stresses shall be reduced by the ratio of the modulus of compressive elasticity to 29,000 for values of (t – c)/R less than 0.0175 and by the ratio of the minimum yield strength for the aluminum alloy in question to 30,000 for values of (t – c)/R equal to or greater than 0.0175 (see 5.5.2 for definitions). In all other equations in this standard API standard 650 welded storage tanks where yield strength or modulus of elasticity is used, such as Equations 27 and 28, similar corrections shall be made for aluminum alloys.
Prefabrication requirements of large vertical API standard 650 welded storage tanks accessories: the prefabrication shall be deepened as far as possible in strict accordance with the requirements of construction drawings and specifications, according to the principle of convenient installation and construction, as much as possible to reduce the installation workload, especially the workload of high-altitude operation. The prefabricated accessories shall be strictly inspected to ensure the quality and make marks. In addition, effective measures should be taken to prevent deformation, damage and corrosion during storage, transportation and stacking on site.
Safety production is the cornerstone of enterprise survival and development. The company established a safety management network, which achieved clear powers and responsibilities, clear responsibilities, effective management and control, and provided organizational guarantee for safe production. The company strictly complies with the "Environmental Protection Law", establishes an effective environmental protection emission control system and waste gas, waste water, waste solid recycling system, and makes great efforts to harden, lighten, green, and beautify the plant, and strive to build green steel enterprises.
Box making, door-to-door: fill in the packing plan: box making time, ship name, voyage number, customs declaration number, transfer port, destination port, gross weight, number of pieces, volume, door point, contact person, telephone number, etc., and arrange the train shift 1-2 days before the closing date (two days before the ship's date). Internal loading: fill in the packing plan: ship name, voyage number, customs declaration number, transfer port, destination port, gross weight, number of pieces, volume, cabin number, etc., and arrange the train shift 1-2 days before the closing date (two days before the ship's date).
It is very important for a company to have a sound after-sales service system, which better guarantees the interests of customers and increases the reliability of the company's products in the hearts of customers. Our company has a dedicated after-sales service team and good after-sales service reputation, and has been recognized by customers over the past decades. Whenever there is problem about our API standard 650 welded storage tanks steel materials during application on the user site, our after-sales service persons will assist to find solutions at the first time.