API standard 650 welded steel oil storage tanks internal structures

For the welding of API standard 650 welded steel oil storage tanks bottom, attention should be paid to the slag removal and drying of the welding joint before welding, and there is no sediment and oil contamination in the lap joint of steel plate. The manufacturing quality and production efficiency of the central plate can be obviously improved by adopting the rolling central plate. The butt joint is used between the rolling plates to improve the installation conditions of the central plate at the bottom of the API standard 650 welded steel oil storage tanks. The welding sequence of the central plate is from the center of the central plate to the surrounding.

Foundations and subgrade shall safely carry the weight of the tank API standard 650 welded steel oil storage tanks and its contents when the tank is filled with water to the highest level required for a hydrostatic test or other water-loading operations, even though the tank itself may be designed for some lesser density of liquid. However, in cases where the character of the soil justifies it and a competent soil expert advises it, allowance may be made for the relatively short duration and intermittent nature of the water loadings if suitable account is taken of all such loadings that may be expected to occur during the life of the tank, including not only those loadings that are incidental to periodic repetitions of the hydrostatic test in accordance with 7.18 but also water-filling operations for gas-freeing purposes.

The reticulated API standard 650 welded steel oil storage tanks shell API 650 storage tank is an important large-span space structure with high safety. Generally, the large-scale API 650 storage tank with a diameter of 21-60 meters or a volume of more than 20000 cubic meters should adopt the reticulated shell technology, which has been widely promoted and adopted in the world and China's petrochemical industry for more than 30 years.

Have a question? Get a Free Consultation

If you are interested in our storage tanks, you can get contact with us through online consulting, demand table submission, e-mails and telephones.

Corporate Office

High-Tech Development Zone, Zhengzhou, China

Contact us

+86-371-86151527
[email protected]

Send a Message!