The preparatory work before the construction of the API standard 650 unanchored tanks is an important part of the oil tank project. Material purchase preparation before the construction of the API standard 650 unanchored tanks:
Before API standard 650 unanchored tanks construction, all materials shall be purchased and prepared, and the specifications and quality of materials shall be inspected to see if they meet the construction operation requirements. Fire and rain proof measures should be taken when storing materials. Paint should be stored in a ventilated and dry place.

The API standard 650 unanchored tanks stiffener ring and backing strip (if used) are primary components, and they shall comply with the requirements of API 620 storage steel tank Q.2.1. The stiffener rings may be fabricated from plate using an intermittent weld on alternating sides between the web and the flange.
Except for aluminum or stainless steel tanks, all fillet welds shall consist of a minimum of two passes. The ends of the fillet welds shall be 2 in. from the rat hole (see Figure Q-1), and these welds shall be deposited by starting 2 in. from the rat hole and welding away from the rat hole. An acceptable alternative to the detail that includes stopping fillet welds 2 in. short of the rat hole would be to weld continuously through the rat hole from one side of the stiffener to the opposite side. All craters in fillet welds shall be repaired by back welding.

The interior of API 650 storage tanks to be internally lined or coated must have all edges rounded to a minimum of 3 mm radius. Internal welds must be completely seal welded, ground smooth, and free from API standard 650 unanchored tanks surface porosity, pockets, and high spots. Remove weld spatter. Vendor as specified on API 650 storage tanks drawing must perform additional surface preparation.

Management concept: integrity is the cornerstone, talent is the foundation, and service is the key.Business philosophy: to keep faith, to win by quality, customer first, win-win development.Based on integrity, win customers with good reputation, win competition with excellent product quality, improve service with customer orientation, and pursue the goal of win-win development in cooperation with customers.Sincerely welcome customers to visit and negotiate business.

Have a question? Get a Free Consultation

If you are interested in our storage tanks, you can get contact with us through online consulting, demand table submission, e-mails and telephones.

Corporate Office

High-Tech Development Zone, Zhengzhou, China

Contact us

+86-371-86151527
[email protected]

Send a Message!