API standard 650 SUG II tanks drain pipe

Design calculations and drawings required API standard 650 SUG II tanks for the fabrication and erection of each API 650 tank. A drawing index for each API 650 tank is required and shall be re-submitted each time drawings are revised and re-issued.

Preheat Treatment
Many laboratory tests have shown preheat treatment of carbon steel to 300°F-400°F to be the equivalent of the post-heat treatment at no less than 1100°F insofar as the physical properties of the weldment are concerned.40,41 Some tests have indicated a slight advantage of the post-heat treatment. Most of the tests have been made on plates 3/4 in. - 1 in. thick; results must be viewed with caution if preheating is applied appreciably beyond this thickness range. However, for all practical purposes, improvement resulting from preheating is sufficiently well established so that preheat should be considered for field fabrication of API 620 crude oil tank plates over 3/4-in. thick whenever toughness of the tank API standard 650 SUG II tanks is highly desired and the thermal post-heat treatment is impractical.

Prefabrication requirements for API standard 650 SUG II tanks, large vertical storage tanks:
1. The machined surface of the edge of the steel plate should be smooth, and there should be no defects such as slag inclusion, delamination, cracks, etc., and the surface hardened layer produced by the flame cutting groove should be removed.
2. Dimension deviation after steel plate processing: the deviation of plate width is less than 1.5 mm, the deviation of plate length is less than 2 mm, and the difference between diagonals is less than 3 mm.

In 2019, through the concerted cooperation of the enterprise team, the sales volume has grown steadily, and the annual sales volume has exceeded 300 million yuan. For this reason, both the investors and employees of the enterprise have received satisfactory returns. With strong development potential and brand advantages, we have always been committed to "integrity, efficiency, pragmatism, dedication" corporate spirit, dedication to society, and return to the public. From this perspective, the enterprise will have a bright future. In a good environment with strong hardware facilities and excellent management personnel, we can make sure that the company will develop stronger and bigger.

With the continuous development of foreign business, our company has achieved pleasant cooperation with a number of freight companies, including international air transport (including international express) and sea bulk cargo, we can provide the best service. In order to better develop the air transport from mainland to foreign countries, so that the goods can be transferred in Hong Kong in a timely manner.

Before delivering our hot rolled plate product we apply various tests to check the quality of carbon steel API standard 650 SUG II tanks plates such as- mechanical test, chemical test, hardness test, toughness test, eddy current test, impact test, micro test, flaring test, flattening test, etc. We are provided best packing for structural steel plates to avoid rust. Our after-sales service team will contact you if you have any question.

Have a question? Get a Free Consultation

If you are interested in our storage tanks, you can get contact with us through online consulting, demand table submission, e-mails and telephones.

Corporate Office

High-Tech Development Zone, Zhengzhou, China

Contact us

+86-371-86151527
[email protected]