API standard 650 stainless and carbon steel tank decks
The design metal temperature of API standard 650 stainless and carbon steel tank each component exposed to the liquid or vapor being stored shall be the lower of the following:a)The minimum temperature to which the tank contents will be refrigerated, including the effect of subcooling at reduced pressure.b)The minimum metal temperature anticipated when the atmospheric temperature is below the refrigerated temperature (see 4.2.1). The effectiveness of the insulation in keeping the metal temperature above the expected minimum atmospheric temperature shall be considered.
Before pressure test, the main drain hose system of API 650 petroleum storage tank floating roof should be thoroughly flushed. Provide blind flanges, gaskets and bolts required for the API standard 650 stainless and carbon steel tank test (other types of covers are also required if necessary). Covers for maintenance shall be provided in accordance with the interfaces specified by API 650 petroleum storage tanks, and these seals shall remain in place after the test; and for those interfaces that are not provided for maintenance covers, the covers can be removed after the API standard 650 stainless and carbon steel tank test.
We have lots of successful cases, for example in July 2015, we exported 5714 tons ASTM A36 mild steel plate to Peru. After receiving the plates and putting then into use, our customer spoke highly of the ASTM A36 mild steel plate quality. In addition, the customer also introduced us an Venezuela customer, who bought 933 tons A36 steel API standard 650 stainless and carbon steel tank plate from us. And then in Mar. 2016, due to the first cooperation in July 2015 is very successful. The customer is very satisfied with our product quality and comprehensive service. This time, the customer place an 3989 tons order directly.
}In order to prevent the deformation of the bottom of metal vertical API standard 650 stainless and carbon steel tank during welding, comprehensive control measures such as strict control of assembly geometry size, reasonable welding procedure, process control of welding deformation and rigid fixation are adopted during assembly welding. The specific methods are as follows:1. Strictly control welding groove forming of API standard 650 stainless and carbon steel tank.2. Strictly control the size of tank welding seam assembly.3. Define the welding sequence of tank bottom plate.4. Reasonable distribution of welders.
After-sales service team is a key department to test the steel quality. Product quality is always the foundation of our survival and development. The company's full inspection from raw materials to finished products; and implements standardized, scientific, and strict internal quality control and management systems in accordance with the process flow during the production process; products can only leave the factory if qualified, and follow-up problem solving systems are implemented in after-sales services to guarantee the customers’ interest.