API standard 650 open top welded storage tanks service conditions
This API 650 tank standard does not present orstablish a fixed series of allowable tank sizes: instead, it s intended to permit the purchaser to select whatever size API standard 650 open top welded storage tanks tank may best meet his needs.
The company has our own truck fleet, and can transfer products flexibly and quickly. At the same time, we have large warehouses near the ports of Tianjin and Shanghai, so as to ensure that we can deliver high-quality products to customers in the first time. At the same time, it also greatly reduces the transportation cost, and realizes the double harvest of time benefit and economic benefit. Time guarantee is one of the important strengths of our service.
Proof Tests for Establishing Allowable Working PressuresBecause pressures in liquid storage tanks built according to these rules vary quite markedly from the tops to the bottoms of the tanks, proof testing of these tanks presents problems not usually encountered in the construction of unfired pressure vessels–especially where the API standard 650 open top welded storage tanks parts under investigation are located near the bottoms of the tanks. The principal difficulty is devising a test or series of tests that will reliably establish the working pressure that can be permitted on the part of the unproven design without, at the same time, imposing hazardous conditions on other parts located at higher levels in the tank.
When providing technical services on site, the after-sales personnel shall strictly abide by the safety rules and regulations of the construction site, consciously take safety protection measures (such as wearing safety helmet when entering the construction site), accept the supervision and management of the site; without permission on the construction site, they shall not dismantle, smear or damage any goods; the commissioning of contract goods shall be carried out under the supervision of the site supervisor If necessary, it shall be approved by the site supervisor or the person in charge of the project department.