API standard 650 open top welded storage tanks non-armored hose-type drains
Upon completion of API standard 650 open top welded storage tanks construction, provide Purchase with a Vendor's Certification that the tank conforms to the requirements of API 650 and to the additional requirements as specified.
Steel transportation because of the special material of API standard 650 open top welded storage tanks steel, is a metal with "iron" as the main basic element, small volume and large weight, and easy to oxidize and rust when contacting with air and rain water, so there are many precautions in the transportation of steel. There are 11 proverbs for steel transportation: "evenly placed, moisture-proof and rust proof". Our company chooses the logistics aspect to be very rigorous, takes the customer's request as the standard, guarantees the steel product quality.
Impact Tests for High AlloysImpact tests are not required for oil steel storage material nickel alloy welds made with electrodes/filler metals covered by AWS Specification A5.11 or AWS Specification A5.14, provided the nominal nickel content is 50% or greater, and the weld is deposited by the shielded metal-arc welding (SMAW), gas metal-arc welding (GMAW), gas tungsten-arc welding (GTAW), or plasma-arc welding (PAW) processes. When A5.11/A5.14 specifies the nickel content as a “remainder,” the nickel content shall be determined by summing the maximum specified values of the other elements (use the average specified value for elements with specified ranges) and subtracting from 100%.
Prefabricating API standard 650 open top welded storage tanks components before construction can improve construction efficiency, save time and cost, and is currently a common method for the construction of large vertical storage tanks. The main prefabricated components of a large vertical API standard 650 open top welded storage tanks include the tank body, the storage tank wall, the top of the storage tank, the bottom of the storage tank, and the accessories of the storage tank. The prefabrication of the components should follow a reasonable workflow, and carry out appropriate heat treatment and testing, so as to improve manufacturing accuracy.