API standard 650 larger diameter tanks impulsive natural period
API 650 petroleum storage tanks are used for API standard 650 larger diameter tanks storage. API 650 petroleum storage tanks can be made of carbon steel, austenitic stainless steel and nickel alloy (only for low temperature). Welding API standard 650 larger diameter tanks certification is regulated by Section 10 of the American Society of Mechanical Engineers (ASME). For API 650 petroleum storage tanks, non-destructive inspections are required, but third-party inspections are not required.
The water dissolved in the oil will be separated out from the oil stored in the API standard 650 larger diameter tanks for a long time, and the acidic water layer will appear at the bottom of the API standard 650 larger diameter tanks for a long time, which will accelerate the corrosion of the API standard 650 larger diameter tanks and cause the wall thinning and even leakage. With the increase of service life, the API standard 650 larger diameter tanks must be inspected and cleaned regularly to check the hidden danger.
API standard 650 larger diameter tanks Liquid Relief ValvesA tank, which is likely to operate completely filled with liquid, shall be equipped with one or more liquid relief valves at the top of the roof, unless otherwise protected against overpressure. When such valves are, in effect, supplementary relief devices, they may be set at a pressure not greater than 1.25 times the design pressure. Because the relief valve at the pump, which provides the inflow of liquid to the tank, is set at a pressure greater than 1.25 times the design pressure of any tank that may be built under these rules, provision should be made for preventing overfilling of the tank by a self-closing float valve, by some practicable pilot-valve control, or by any other proven device.
Our quality control department will do inspection for details of the steel materials API standard 650 larger diameter tanks before delivery. We would invite the customer side to attend the inspection together. If they can not come, we will also take rich pictures for them to check. Meanwhile, we will publish inspection report and send them the PDF version. Besides, we accept any third party inspection such as SGS, BV, etc. And our quality control department will support the third party to inspect the steel materials smoothly and try our best to deliver the qualified steel materials to customers earlier.
The company's logistics adopts the method of cooperation with logistics companies. As a third-party logistics company is engaged in the operation of multiple logistics projects, it can integrate various logistics resources, making the logistics operation cost relatively low and the logistics operations more efficient. Thus we can provide more professional logistics services, while also focusing on our core business of steel materials.