API standard 650 ground supported tanks method for estimating tank uplift

Compared with the fixed roof API 650 oil storage tank without API standard 650 ground supported tanks floating roof, there is no evaporation space. In principle, this eliminates the so-called "large breathing loss". Evaporation not only causes the loss of product quantity, but also affects the quality of API standard 650 ground supported tanks product and pollutes the environment.

Welders participating in the construction of API standard 650 ground supported tanks must pass the examination and perform welding within the validity period of the qualified items. Special operators such as on-site maintenance electricians, cranes, and shelf workers must hold job certificates. All oil pipelines need to use arc welding for bottoming and electric welding to ensure the welding quality. Oil tanks and process pipelines must be tested for non-destructive flaws in accordance with the flaw detection ratios and methods required by the design and acceptance specifications. The flaw detectors must be certified.

Team concept: respect, communication, coordination and symbiosisBusiness philosophy: leading by strategy, driving by innovation, creating valueManagement concept: goal oriented, efficient operation, stimulation of vitality and continuous improvementQuality concept: standard guidance, control process, craftsman spirit, leading serviceTalent concept: lifelong learning, give full scope to the talents, the sea refuses no riverInnovation concept: innovation is the first driving force for the company's high-quality developmentCustomer concept: taking customers as the center is the foundation of the company's survival and development

"Efficiency is benefit, time is money", the company is equipped with a high standard logistics team. After the products pass the factory inspection, they will coordinate the shipment as soon as possible according to customer requirements and schedules to hand over the booked steel materials to customers at the first time, to ensure no delay of customer's project progress, to strive for more project preparation time for customers.

Have a question? Get a Free Consultation

If you are interested in our storage tanks, you can get contact with us through online consulting, demand table submission, e-mails and telephones.

Corporate Office

High-Tech Development Zone, Zhengzhou, China

Contact us

+86-371-86151527
[email protected]

Send a Message!