API standard 650 flat-bottom steel tanks double-flanged nozzles
The company has been engaged in the design, construction and installation of foreign API 650 standard API standard 650 flat-bottom steel tanks storage tanks for a long time. It has the international qualification of ASME welding technology, has the design ability of API 650 oil tanks and API 650 storage tanks, and has pressure vessel design and manufacturing license and GC pressure pipeline installation license. Certificate, API standard 650 flat-bottom steel tanks petrochemical equipment pipeline general contracting qualification, safety production license, international trade import and export license.
The mechanical seal of floating roof API standard 650 flat-bottom steel tanks relies on mechanical force to press the sealing steel plate tightly against the tank wall, so that it can slide on the tank wall and avoid gap as far as possible. However, mechanical seal has high requirements for the geometry of storage tank and poor adaptability, so mechanical seal is rarely used in newly built floating roof API standard 650 flat-bottom steel tanks.
API standard 650 flat-bottom steel tanks Pressure-relieving DevicesTanks shall be protected by automatic pressure-relieving devices that will prevent the pressure at the top of the tank from rising more than 10% above the maximum positive gauge pressure except as provided in API 620 standard 9.2.2.Where an additional hazard can be created by the exposure of the tank to accidental fire or another unexpected source of heat external to the tank, supplemental pressure-relieving devices shall be installed. These devices shall be capable of preventing the pressure from rising more than 20% above the maximum positive gauge pressure. A single pressure-relieving valve may be used if it satisfies the requirements of this paragraph and 9.2.1.
The quality inspection department is responsible for the inspection management of raw materials and finished products, and the quality inspection and acceptance of products and raw materials. Strictly abide by the company's management system, conscientiously exercise the management power given by the company, and put an end to all ultra vires; be responsible for the inspection of all kinds of raw materials entering the company, and put forward quality problems and handling opinions.
Box making, door-to-door: fill in the packing plan: box making time, ship name, voyage number, customs declaration number, transfer port, destination port, gross weight, number of pieces, volume, door point, contact person, telephone number, etc., and arrange the train shift 1-2 days before the closing date (two days before the ship's date). Internal loading: fill in the packing plan: ship name, voyage number, customs declaration number, transfer port, destination port, gross weight, number of pieces, volume, cabin number, etc., and arrange the train shift 1-2 days before the closing date (two days before the ship's date).