API standard 650 flat-bottom oil storage tanks shipping
In this project, an area of tank wall is constructed of ASTM A285, Grade C, steel plate that is 5/8-in. thick and has spot-radiographed, double-welded butt joints. The wall is subject to tension in a meridional direction and to compression in a latitudinal direction. The values of R1 and R2 at the point under consideration are 75 in. and 300 in. respectively. A corrosion allowance of 1/16 in. is required. The computed (meridional) tensile stress, stc, in the net thickness after deduction of the corrosion allowance is 6000 lbf/in.2. The problem in this example is to find the maximum allowable (latitudinal) compressive stress value for the given conditions, in conformance with the provisions of API 620 tank standard 5.5.4.5.The outer FRP of API 650 oil tank will not produce electrolytic corrosion with groundwater and brine. The outer FRP will not corrode with gasoline, diesel oil and leaded gasoline API standard 650 flat-bottom oil storage tanks. The leakage detector can monitor the whole process 24 hours to eliminate the potential pollution. The leakage detection system is convenient for the inspection and maintenance of API 650 oil tank, and protects the original ecological environment of soil and groundwater.Myanmar 4800 tons ABS AH36 and ABS A shipbuilding plates. This is very good customer of us, and we have cooperated many times for shipbuilding plates API standard 650 flat-bottom oil storage tanks . The most frequently ordered is shipbuilding plates, almost hundreds tons every 2 month, which are finally supplied to Myanmar’s navy. Just in last year, we have supplier more than 4800 tons shipbuilding plates for the customer continuously.The preparatory work before the construction of the API standard 650 flat-bottom oil storage tanks is an important part of the oil tank project. Material purchase preparation before the construction of the API standard 650 flat-bottom oil storage tanks:Before API standard 650 flat-bottom oil storage tanks construction, all materials shall be purchased and prepared, and the specifications and quality of materials shall be inspected to see if they meet the construction operation requirements. Fire and rain proof measures should be taken when storing materials. Paint should be stored in a ventilated and dry place.When providing technical services on site, the after-sales personnel shall strictly abide by the safety rules and regulations of the construction site, consciously take safety protection measures (such as wearing safety helmet when entering the construction site), accept the supervision and management of the site; without permission on the construction site, they shall not dismantle, smear or damage any goods; the commissioning of contract goods shall be carried out under the supervision of the site supervisor If necessary, it shall be approved by the site supervisor or the person in charge of the project department.
Latest NewsMore+