API standard 650 closed top welded storage tanks inspecting requirements

Requirements for prefabrication of the top of large vertical API standard 650 closed top welded storage tanks: The prefabrication of the tank top shall be prefabricated in blocks according to the drawings. Pay attention to the spacing of the welds after installation when setting out the material. Reinforcing ribs should be formed and inspected with an arc-shaped template. When a single top plate needs to be spliced, butt joints should be used. The forming of a single top plate should be welded between the reinforcing ribs and the top plate on the mould. After forming, check with an arc-shaped sample plate, and the gap should not be greater than 10 mm.

API 620 storage tanks relative standard for referenceASTM A106 Seamless Carbon Steel Pipe for High-Temperature ServiceASTM A131 Shipbuilding Structural Steel for API standard 650 closed top welded storage tanksASTM A134 Welded Steel PipeASTM A182 Forged or Rolled Alloy-Steel Pipe Flanges, Forged Fittings, and Valves and Parts for High-Temperature ServiceASTM A193 Alloy-Steel and Stainless Bolting MaterialsASTM A194 Carbon and Alloy Steel Nuts for Bolts for High-Pressure and High-Temperature ServiceASTM A213 Seamless Ferritic and Austenitic Alloy-Steel Boiler, Superheater, and Heat Exchanger TubesASTM A240 Stainless Steel Plate, Sheet, and Strip for Pressure VesselsASTM A283 Low and Intermediate Tensile Strength Carbon Steel Plates

According to API Standard 650, the stairs used for API 650 petroleum storage tanks or thermal insulation tanks should be double longitudinal beams supported by a minimum of ribs. If the gap between the API standard 650 closed top welded storage tanks tank shell and the stringer of the API 650 petroleum storage tank exceeds 200mm, handrails should be provided on both sides of the stairs. Unless otherwise specified, according to API standard 650 closed top welded storage tanks ASTM A123, the following accessories shall be hot-dip galvanized. The damaged zinc coating should be repaired with zinc alloy.

Have a question? Get a Free Consultation

If you are interested in our storage tanks, you can get contact with us through online consulting, demand table submission, e-mails and telephones.

Corporate Office

High-Tech Development Zone, Zhengzhou, China

Contact us

+86-371-86151527
[email protected]

Send a Message!