API standard 650 aboveground welded storage tanks reinforcement of weld
BBN can provide design, manufacture and installation of API 650 large oil and crude oil storage tanks. We can build a API standard 650 aboveground welded storage tanks 7,000,000 gallon API 650 petroleum storage tank. In addition, BBN has the means to construct multiple storage tanks at the same time. We are very experienced in providing API 650 petroleum storage tanks.
Design of Compression-ring RegionsIn this project, a cylindrical tank 30 ft in diameter is designed for an internal pressure of 5 lbf/in.2 gauge in the vapor space. The plate material is ASTM A131 Grade A steel for thicknesses of 1/2 in. and less. The top course of the butt- welded cylindrical sidewall is 1/4 in. thick, including a 1/16 in. corrosion allowance. The tank API standard 650 aboveground welded storage tanks roof is a butt-welded spherical dome with an internal radius of 30 ft and a thickness of 1/4 in., including a 1/16 in. corrosion allowance. The maximum design liquid level is 6 in. below the plane of the juncture of the roof and sidewall.
Oil tank is often used to store crude oil, diesel oil, gasoline and other oil. The main structure of API standard 650 aboveground welded storage tanks is composed of tank top, tank wall, tank bottom and accessories. The API standard 650 aboveground welded storage tanks should be inspected after the completion of construction, and the detection methods of different structure positions are different. Tank wall inspection: for the newly built oil tank, water filling test shall be conducted to check whether the tank wall is tight, and the appearance inspection shall be conducted for the tank wall plate and weld. Tank wall thickness detection: the oil tank wall thickness is mainly detected by ultrasonic wave, with high efficiency.
Insist on the spirit of development and indomitable entrepreneurship; the spirit of leading science and technology and striving for first-class affairs; the spirit of strict management and market development; the spirit of taking the lead in setting an example and selfless dedication; and the spirit of people-oriented and enterprise ownership.
Box making, door-to-door: fill in the packing plan: box making time, ship name, voyage number, customs declaration number, transfer port, destination port, gross weight, number of pieces, volume, door point, contact person, telephone number, etc., and arrange the train shift 1-2 days before the closing date (two days before the ship's date). Internal loading: fill in the packing plan: ship name, voyage number, customs declaration number, transfer port, destination port, gross weight, number of pieces, volume, cabin number, etc., and arrange the train shift 1-2 days before the closing date (two days before the ship's date).
We should help solve the customer's problems in time, not just verbally, without solving the problems or shirking the responsibility. Improving after-sales efficiency can make customers feel respect. We should take their problems seriously and show sincerity. It can also give customers a good impression and reduce the negative impact.