API 650 welded steel oil storage tanks designed without anchorage

Qualifications of API 620 storage tanks ExaminersExaminers for tanks constructed according to the rules in this standard shall have had not less than 5 years experience in design, construction, maintenance and/or repair, or in the responsible supervision of the construction, maintenance and/or repair of various types of unfired pressure vessels and/or API 650 welded steel oil storage tanks tanks, including at least 1 year of experience in the construction or supervision of the construction of vessels or tanks by fusion welding. Satisfactory completion of a suitable course of training approved by the Purchaser or the Purchaser’s agent may be substituted for 3 of the 5 years experience. However, training cannot replace more than 6 months of the required experience on fusion-welding construction.

Supply covers for API 650 welded steel oil storage tanks connections specified with the service covers remaining in place following tests. For API 650 tank connections not specified to be supplied with service covers, the test covers may be removed after testing.

In 2016, we brought our customer to visit our NM400 hot rolled plate; producing line and our shanghai warehouse for 30,000 tons plate and structure. As a result, Our client purchased 500 tons NM400 as first order, which is shipped by 3 times. In future. Our company will always guarantee that all the delivery condition for Hardox plate API 650 welded steel oil storage tanks provided will be with quenching and tempering, which is the best delivery type according GB/T 24186 standard.

}

Proper use of API 650 welded steel oil storage tanks and precautions:
1. The API 650 welded steel oil storage tanks must be used within the safe height range;
2. Check before use to ensure that the safety valve and breathing valve are flexible and easy to use;
3. The explosion-proof and fire-proof safety measures for oil tanks are implemented effectively;
4. The oil level in the API 650 welded steel oil storage tanks should be accurately measured when receiving and delivering oil, so as to prevent overflow or empty;
5. In the process of receiving and sending oil, the flow rate of oil should be controlled, and it should not be too fast to avoid electrostatic accidents.

After sales service support personnel pay attention to commitment in their work. In the process of people to people communication, mutual trust is an important factor for the long-term and stable communication. After sales service personnel must do what they say in the process of communication with customers.

Have a question? Get a Free Consultation

If you are interested in our storage tanks, you can get contact with us through online consulting, demand table submission, e-mails and telephones.

Corporate Office

High-Tech Development Zone, Zhengzhou, China

Contact us

+86-371-86151527
[email protected]

Send a Message!