API 650 vertical welded storage tanks isolation valves

API 650 petroleum storage tank stipulates that if the thickness of the lower siding obtained by calculating the anti-overturning moment is greater than the thickness of the API 650 vertical welded storage tanks hydrostatic pressure test (both do not include the corrosion margin), the calculated thickness of the above siding required by the hydrostatic pressure is It should also be increased by the same proportion, unless special analysis is performed to determine the seismic overturning moment and corresponding stress at the bottom of each layer of API 650 petroleum storage tank wall.

Static storage loss is also known as "small breathing" consumption. The rise and fall of the temperature in the API 650 vertical welded storage tanks leads to the increase and decrease of the pressure in the tank, which makes the mixed oil gas discharged from the tank, and the external air is sucked into the tank, resulting in the oil consumption. Fluid level loss is also called "big breathing" loss. It is the oil consumption caused by the change of gas space volume in the API 650 vertical welded storage tanks during the oil receiving and sending operation, which causes the mixed oil gas to be discharged out of the tank, and the external air is sucked into the tank, resulting in the oil consumption due to the change of liquid level height.

The pressed-steel, round manhole with a 20-in. inside diameter shown in Figure F-8 is located in API 620 crude oil tank solid plate in spherical portion of a torispherical roof on a cylindrical storage tank 72 ft in diameter. The internal pressure, Pg, on the underside of the roof is 15 lbf/in.2 gauge. The thickness, t, of the roof plate required by 5.10.3 for the spherical portion of the roof is 1/2 in., which is exactly the thickness provided. No corrosion allowance is required. The materials in the oil tank roof plates and manhole frame conform to ASTM A283 Grade C steel; the main joints in the roof are double-welded butt joints, spot radiographed in accordance with 7.16 and 7.17.

We can process the steel materials according to your drawing. Or if you can not make drawing, please send us API 650 vertical welded storage tanks specific data and requirements, our technical department can make design and drawing for you, and then confirm with your technician or engineer. If all is OK, our processing center will process the steel materials according to the drawing. So no matter what size and shapes you need, we can meet demands at the most time.

The company adheres to the needs of customers, adheres to win-win integrity, and relies on scientific and technological innovation to continue to improve the level of logistics equipment technology and information technology, and enhance the logistics technology research and development and innovation capabilities. Based on market demand and innovation as the driving force for development, the company actively expands the field of logistics services, accelerates the extension of the logistics industry chain, and scientifically advances the diversification of the logistics industry.

Have a question? Get a Free Consultation

If you are interested in our storage tanks, you can get contact with us through online consulting, demand table submission, e-mails and telephones.

Corporate Office

High-Tech Development Zone, Zhengzhou, China

Contact us

+86-371-86151527
[email protected]

Send a Message!