API 650 SUG III tanks internal components

The company regularly holds sales elites to share experiences, to promote the rapid growth of colleagues, and achieve the company and employees. The company conducts employee skill training and related knowledge video learning from time to time. All these things is to improve the employees' skills and literacy, and reflects its own value. It has always been the pursuit of BBN steel to enhance the employee’s ability and keep up with the times.Data Required from Manufacturer on Completed TanksIf specified in the purchase order, the Manufacturer shall supply marked copies of plans (or a separate sketch) showing the location of all plates, with a means of identifying each plate with the heat numbers. These markings shall be checked by the inspector. A copy shall be attached to the Manufacturer’s report.Check of Stress-relieving OperationThe API 650 SUG III tanks inspector shall check any thermal stress-relieving operation and shall be satisfied that the temperature readings are accurate and that the procedure conforms to the applicable requirements of these rules.Welding certification is regulated by Section 10 of the American Society of Mechanical Engineers (ASME). For both API 650 SUG III tanks storage tank API 650, non-destructive inspection is required, but third-party inspection is not required.The company always adheres to the concept of green production, follows the development path of innovation, transformation and improvement, and has carried out in-depth cooperation with Zhengzhou University and other scientific research institutes, planning from a high starting point, strict standard design, and successfully implementing engineering projects With nearly 20 research and development projects, the company's production technology and equipment are at the forefront of the industry, and indicators such as environmental protection, energy consumption, cost, and resource utilization have reached the advanced level in the industry.As we know, the vertical metal tank, API 650 SUG III tanks is welded by many components, and the welding quality of each component determines the later use effect of the API 650 SUG III tanks. Professional API 650 SUG III tanks manufacturers should have a set of professional skills in the welding process of API 650 SUG III tanks. Key points for weld inspection of vertical metal tank, API 650 SUG III tanks:
1. It is strictly forbidden to paint the welds before passing the inspection.
2. Visual inspection shall be carried out for welds.
3. NDT shall be carried out on the weld.

Have a question? Get a Free Consultation

If you are interested in our storage tanks, you can get contact with us through online consulting, demand table submission, e-mails and telephones.

Corporate Office

High-Tech Development Zone, Zhengzhou, China

Contact us

+86-371-86151527
[email protected]

Send a Message!